Laserfiche WebLink
� <br /> � <br /> U8�^�^���� ��i «*�� ��nonn��xx � <br /> Indian — . ` <br /> Purchasing <br /> Division ; <br /> ������U�� � <br /> 1800 271h_StreetVero Beach, FL 32960 <br /> � <br /> � <br /> Phone 226-1416����� <br /> "' _. � <br /> � <br /> �U���U�U�U��� U��� � ^ <br /> ����u�n�o�����x�o o���° m� � <br /> � <br /> [j8t2: january 9� 2017 � <br />� <br /> Project Name: Indian River County ShootingHunter Education Classroom � <br /> � ������� <br /> �'H ���MO=��^ °-=�"�~"�° ^ <br /> ~`.. . � <br /> � <br /> Bid Opening Date: � <br /> This addendum breleased tomake modifications tothe bid documents, answer questions received, and <br />� <br /> provide the agenda and sign in sheets from the Mandatory pre-bid meeting. All information provided <br />� <br /> within this document are hereby incorporated into the bid documents.We anticipate release of <br /> /�ddendurn8onJanuary 1Otmanswer renmoiningquesbonsreceived. | <br /> ! <br /> |� <br /> , <br /> Pre Bid Meeting Minutes and Sign-In Sheet i <br /> Energy CmdeCompliance Form ! <br /> Updated Plan Sheets C4and C5 <br /> Storage Building Sketch <br /> The following questions have been received: <br /> Question 1: Doyou have ocutoff date for submitting QVesdons/RF|'s? <br /> Answer:All questions must be received by the Purchasing Division 10 days prior-to bid opening. . <br /> Question 2: We need more specifications regarding the glazing. Plans call for tinted Impact Rated Glass <br /> and the structural offer the wind pressures, but no glass thicknesses or performance specs were provided <br /> ` to show what will be needed to comply with the Energy Ca|uofor the project? No energy Ca|co were <br /> � <br /> provided inthe bid documents. <br /> ' <br /> Answer:See attached Energy Calculation and glazing minimum performance requirements per the <br /> / <br /> attached Energy Code. <br /> Question <br /> 3: Is there a Manual orEnergy Calculation available? if mo please provide location of � <br /> � <br /> documents. <br />� <br /> Answer: Please see Question 2. <br /> | <br /> ' <br /> Question 4: Page C5 plan view shows top of drain field elevation is 24.8, but in Detail AA is showing <br /> / e|evaton24.5 please clarify. <br /> i <br /> ' <br />� | ' <br />� | <br /> Page I of 3 <br /> [ <br /> i <br /> _ <br />