My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-027E
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-027E
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2017 11:00:38 AM
Creation date
3/21/2017 2:02:01 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/21/2017
Control Number
2017-027E
Agenda Item Number
8.K.
Entity Name
Proctor Construction LLC
Subject
Indian River County Shooting Range
Contract & Specifications
Hunter Education Classroom
Area
IRC Shooting Range
Project Number
1213C
Bid Number
2017008
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
375
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
| � <br /> Addendum 2-2Ol7OOO <br /> Answer:Top of Drain field Elevation is EL 24.8. Detail A-A on Plan Sheet C5 has been revised to reflect � <br /> that elevation (attached). � <br /> Question 5: Page EO.1 type F outdoor rated ceiling fans specified by architect. Please provide <br /> specifications. <br /> Answer: N4inka��re F573-ORB,Sundance Oil-Rubbed Bronze 43"outdoor Ceiling VV� <br /> n�Fan or�quo|. hthe ^, <br />� <br /> following specifications: <br /> °~ 42" Blade Span .. <br /> * ULWe |isted � <br /> * 12.2S" Height,Top toBottom � <br />� "/ Standard Mount <br /> Select Finish: Oil-Rubbed Bronze with Five, Dark Oak All Weather Blades ' <br />� Question 6; CS has no existing ground elevations in the proposed building site. P|eoseprovde existing � <br /> elevations. <br /> Answer:The Trap and Skeet as-builts for this area are included on the updated Plan Sheet C5, attached-. <br />� <br /> Present existing grade in this location should be assumed to be EL 22.6. }r <br /> ' <br /> Question 7: Please check the length call out for the 12" RCP crossing sidewalk on northside of the | � <br /> project. [a|| outshoxxs47LFbutison|ynneasuresl1' p|usthe3W1ES � <br /> Answer: correct length is 11',as shown on the updated Plan Sheet C5, attached. \ <br /> Question 8: Please specif»povversupply requirennentsfor sexxer||ftstation. Nodetails onK8EP. [ <br /> ' <br /> Answer: Lift station specified on updated site plan requires a single pole, dedicated 2Oamp circuit. See ' <br /> / <br /> Attached Site Plan Sheet[-4. !` <br /> ' <br /> Question 9i item#2 is the existing conduit stubbed from storage building to classroom for connection of <br /> servicennarkedxvitha |ocobmrstaheatitpo|htofternninationforfie|dinspectionpurposes. \fnmtcou|d <br /> you provide as-built drawing showing so that the completion of that conduit service can be properly <br /> quantified and priced. <br /> Answer: Please refer tothe attached storage building sketch. <br /> Question 10:What iythe distance from Existing Electrical Panel "A"to New Panel "C" in new Classroom <br /> Building? <br /> Answer: Distance from Existing Electrical Panel "/\"to New Panel"C" in new Classroom Building is � <br /> approximately 3SOfeet. Contractor isresponsible for field verification ofthe length ofconduit. <br /> Question 11:What are the manufacturer and Model#ofExisting Panel "A"7 <br /> Answer:Square "D" Load Center,4OOArnp Panel <br />� <br /> Question 12;Could you provide the name mfthe firm who did the surveying for the last phase ofthe work <br />� <br /> out atthe shooting range for the skeet Q'trap facility. <br />� <br /> Answer:Avironn &Associates, Inc. <br />� <br /> Question 13: Please confirm that no fire alarm system is required for this building. If fire alarm system is <br />� <br /> required please provide fire e|arnn design and spec requirements. <br /> Answer:VVeconfirm that no fire alarm system isrequired for this building. <br /> Page Jmf 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.