My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-027F
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-027F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2017 11:00:52 AM
Creation date
3/21/2017 2:21:42 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/21/2017
Control Number
2017-027F
Agenda Item Number
12.F.1
Entity Name
Community Asphalt Corporation
Subject
Round Island Park Pavement Resurfacing
Contract & Specifications
Area
Round Island Park
Project Number
1619
Bid Number
201717
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 1.04 - PREVENTION, CONTROL, AND ABATEMENT OF EROSION AND <br /> WATER POLLUTION <br /> The work specified in this item shall conform to Section 104 of the Florida Department of ' <br /> Transportation Standard Specifications for Road and Bridge Construction with the following <br /> modifications. <br /> PART 1 â GENERAL <br /> 1.1 SCOPE <br /> A. This Section covers erosion control and the treatment of dewatering water and <br /> stormwater runoff from the construction site and work area. Pollution control measures <br /> shall prevent polluted or turbid waters from being discharged from the construction site <br /> or work area to undeveloped portions of the site or offsite, including but not limited to <br /> Multiple Separate Storm Sewer Systems (MS4s) and Waters of the State. <br /> B. The OWNER considers pollution from dewatering water and stormwater runoff from a <br /> construction site or work area to be a very serious offense. The CONTRACTOR is <br /> solely responsible for preventing pollution caused by dewatering water and stormwater <br /> runoff from the construction site or work area. Note that state regulations do not allow <br /> mixing stormwater and dewatering groundwater in the same release â separate and <br /> independent discharges are required. <br /> C. Pollution control measures specified herein represent minimum standards to be <br /> adhered to by the CONTRACTOR throughout the Project's construction. The OWNER <br /> reserves the right to require the CONTRACTOR to employ additional pollution control <br /> measures, when in the sole opinion of the OWNER, they are warranted. If site specific <br /> conditions require additional erosion and stormwater pollution control measures during <br /> any phase of construction or operation to prevent erosion or to control sediment or <br /> other pollution, beyond those specified in the Drawings, the Project's approved <br /> Stormwater Pollution Prevention Plan (SWPPP), or herein, implement additional best <br /> management practices as necessary, in accordance with Chapter 4, "Best <br /> Management Practices for Erosion and Sedimentation Control" of the Florida Erosion <br /> and Sediment Control Inspector's Manual and other references as may be applicable <br /> or required by regulatory permits. <br /> D. The OWNER may terminate this Contract if the CONTRACTOR fails to comply with <br /> this Section. Alternatively, the OWNER may halt the CONTRACTOR's operations until <br /> the CONTRACTOR is in full compliance with this Section. If the OWNER halts the <br /> CONTRACTOR's Work as a result of failure to comply with this Section, the Contract <br /> time clock will continue to run. <br /> E. In addition to these Specifications, comply with Chapter 4 - "Best Management <br /> Practices for Erosion and Sedimentation Control"and Chapter 5â"Best Management <br /> Practices for Dewatering" of the Florida Erosion and Sediment Control Inspector's <br /> 01025-13 Technical Specifications <br /> Fâ˘\Public Works\ENGINEERING DIVISION PROJECTS\1619 Round Island Facility Paving\1-Admin\bid docu ments\M aster Contract <br /> Documents\Technical Specifications.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.