My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-027F
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-027F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2017 11:00:52 AM
Creation date
3/21/2017 2:21:42 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/21/2017
Control Number
2017-027F
Agenda Item Number
12.F.1
Entity Name
Community Asphalt Corporation
Subject
Round Island Park Pavement Resurfacing
Contract & Specifications
Area
Round Island Park
Project Number
1619
Bid Number
201717
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Manual. In the event of a conflict between the referenced chapters and these <br /> Specifications, the more stringent requirement shall prevail. <br /> F. Submit to SJRWMD a "Notice to District of Dewatering Activity" (SJRWMD Form No. <br /> 40C-2.900(12)) prior to commencement of dewatering in accordance with F.A.C. 40C- <br /> 2.042(9). Provide a copy of the Notice to Indian River County. <br /> 1.2 PERMITS <br /> A. The OWNER has obtained certain permits for this project and they are listed in <br /> paragraph 6.08.13 of the EJCDC Standard General Conditions of the Construction <br /> Contract(General Conditions). Per paragraph 6.08.0 of the General Conditions, apply <br /> for and obtain all other required federal, state, and local permits, licenses, sampling, <br /> and tests. <br /> B. Provide copies of all approved permits to the OWNER and ENGINEER and comply <br /> with all conditions contained in all permits at no extra cost to the OWNER. If there is a <br /> conflict between any permit requirement and these Specifications or requirements <br /> between permits, the more stringent specification or requirement shall govern. <br /> C. Pay for all required water quality sampling and laboratory tests. <br /> 1.3 GENERAL <br /> A. Do not begin any other construction work until the pollution control and treatment <br /> system has been constructed in accordance with approved plans, permits, and these <br /> Y pp p , p , <br /> Specifications; and the installed system has been examined by the OWNER for <br /> compliance. <br /> B. From time to time, the OWNER or ENGINEER will inspect the pollution control and <br /> treatment system and may take effluent samples for analysis by a testing laboratory <br /> selected and paid for by the OWNER. If at any time, the OWNER or ENGINEER <br /> determines that the pollution control and treatment system is not in compliance with <br /> the approved system, the OWNER or ENGINEER will shut the portion of the project <br /> down that is not in compliance, and it shall remain shut-down until the pollution control <br /> and treatment system is properly constructed or repaired, and complies with the <br /> approved pollution control and treatment system plans, specifications, contract <br /> documents, and permits. <br /> C. Schedule construction to minimize erosion and stormwater runoff from the construction <br /> site. Implement erosion control measures on disturbed areas as soon as practicable in <br /> portions of the site where construction activities have temporarily or permanently <br /> ceased, but in no case more than 7 days after the construction activity in that portion of <br /> the site has temporarily or permanently ceased. In addition to other temporary erosion <br /> control measures that may be implemented, application of polyacrylamide is required <br /> on all such disturbed areas within 7 days after the construction activity in that portion of <br /> 01025-14 Technical Specifications <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\1619 Round Island Facility Paving\1-Admin\bid documents\Master Contract <br /> Documents\Technical Specifications.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.