Laserfiche WebLink
PROPOSAL <br /> EXHIBIT "A" <br /> Continued <br /> WORK ORDER NO. 2 <br /> Indian River County Public Works Department Professional Surveying and Mapping <br /> Services Master Agreement for Annual Professional Surveying and Mapping Services <br /> CAI Job. No. 17-229S <br /> IR County Work Order No. 2 <br /> Project Limits: <br /> Approximately 700 feet +/-Topographic Route Survey of 103rd Court between 88th Street and 89th Street— <br /> Vero Lake Estates Subdivision Unit H-3 (PB 6, Page 18), Section 28, T.31S., R.38E, Indian River County, <br /> Florida. <br /> Project Scope: <br /> The SURVEYOR shall provide Professional Land Surveying services to include the following: <br /> 1.) Establish horizontal control based on Florida State Plane Coordinate System, East Zone, NAD 83/2011 <br /> and limited recovery of adjacent parcel corners; and establish vertical control network benchmarks along the <br /> subject corridor based on North American Vertical Datum of 1988 not to exceed 600 feet. <br /> 2.) Field observe and record vertical ground spot elevations within project corridor, 10' outside of approximate <br /> right way and all specific points (road pavement, inverts and bottom of structures, swales, etc.) and changes in <br /> contour within the subject corridor. <br /> 3 ) Field observe and record all man-made above ground and natural features (over head electrical, valves, <br /> mail boxes, drive ways, culverts, utility risers, utility boxes, etc. <br /> 4.) Observe and record the existing limits of vegetation, if any, within the project limits of the subject corridor. <br /> 5.) The route survey to be tied into the record plats of the Vero Lake Estates Subdivision Unit H-3. <br /> Specific Notes: <br /> Method of horizontal and vertical observations by G.P S., RTK [accuracy: horizontal 8mm+1 ppm (RMS), <br /> vertical 15mm+1ppm (RMS)], North American Datum of 1983 / Adjustment of 2011, Florida State Plane <br /> Coordinates (East Zone-901) and North American Vertical Datum of 1988. <br /> Project Schedule: <br /> Work will commence on the receipt of the notice to proceed or approved work authorization. <br /> Completion and Final Deliverables: <br /> Five (5) paper "hardcopy" signed and sealed Topographic Route Survey Certificates and an AutoCAD drawing <br /> file with PDF formats will be provided. Field and office tasks will be completed in approximately thirty (30) days. <br /> 2 <br />