Laserfiche WebLink
Compensation: <br /> Payments shall be in accordance with the original Indian River County Public Works Department Professional <br /> Surveying and Mapping Services Master Agreement for Annual Professional Surveying and Mapping <br /> Services. <br /> I. Field and office tasks: horizontal and vertical control for the IRC Topographic Route Survey; Set <br /> vertical control points along the project route survey. Tie subdivision corners and project route <br /> to Florida State Plane Coordinate System (NAD 83/2011) and North American Vertical Datum of <br /> 1988. <br /> Surveyor <br /> 1 hours @ $150.00/hr. . ................ ....$ 150.00 <br /> 3-Man Survey Crew <br /> 2 hours @ $150 00/hr...... . . . ........... $ 300.00 <br /> Total I....... ..... .. .............. .. . ......... $450.00 <br /> II. Field observe and record vertical ground elevations and changes in contour within the subject <br /> corridor and 10 feet outside of approximate right of way. Field observe and record existing <br /> above ground man-made and natural features within the subject corridor, vegetation and well <br /> water point of entry into existing homes. <br /> Surveyor <br /> 1 hours @ $150.00/hr... ...... .......... .... $ 150.00 <br /> Surveyor I <br /> 1 hours @ $140.00/hr....... ................ $ 140.00 <br /> 3-Man Survey Crew <br /> 8 hours @ $150.00/hr...... . .. .. ........ ..$ 1,200.00 <br /> Total 11...... . $ 1,490.00 <br /> III. Data reduction/drafting of Topographic Route Survey maps in AutoCAD format <br /> Surveyor 1 <br /> 2 hours @ $140 00/hr .................. .. .. $ 280.00 <br /> CAD/GIS Tech I j <br /> 16 hours @ $105.00/hr........... .......... .$ 1,680.00 <br /> Administrative Staff <br /> 1 hours @ $45.00/hr........ ....$ 45 00 <br /> Total III..... . . .......... ......... . . $ 2,005.00 <br /> TOTAL I — III........... .............. .........$ 3,945.00 Lump Sum Fee <br /> 3 <br />