Laserfiche WebLink
19 <br />Construct County Lift Station, Complete and Operable. <br />Furnish Pumps Package and Dataflow System. Pump <br />package will include pumps, cables, guide rails and <br />assemblies, float assembly, anchor bolts and washers and <br />nuts, lifting bailes, SS nipples and elbows, float switches, <br />hatch covers, duplex comtrol panel, SS base plates and <br />spare parts, concrete drive and housekeeping pad. Lift <br />Station construction also includes connection to the 4" <br />force main on the west side of 64th Avenue. The price to <br />Include Dataflow equipment with the spare Telemetry <br />Control Unit (TCU) Supply spare parts per IRCDUS <br />Construction Standards Section 10. <br />LS <br />1 <br />$305,625.00 <br />$305,625.00 <br />$203,000.00 <br />$203,000.00 <br />20 <br />Silt Fence <br />LF <br />10,000 <br />$1.00 <br />$10,000.00 <br />$1.00 <br />$10,000.00 <br />21 <br />Install CDBG Sign Per detail sheet 10 of 15 <br />EA <br />1 <br />$1,000.00 <br />$1,000.00 <br />$1,050.00 <br />$1,050.00 <br />22 <br />Maintenance of Traffic <br />LS <br />1 <br />$80,000.00 <br />$80,000.00 <br />$127,168.00 <br />$127,168.00 <br />23 <br />Record Drawings/As-built Survey <br />LS <br />1 <br />$20,000.00 <br />$20,000.00 <br />$47,000.00 <br />$47,000.00 <br />24 <br />Mobilization, Demobilization <br />LS <br />1 <br />$167,000.00 <br />$167,000.00 <br />$90,000.00 <br />$90,000.00 <br />25 <br />Public Construction Bond <br />LS <br />1 <br />$20,032.00 <br />$20,032.00 <br />$16,661.00 <br />$16,661.00 <br />SUB -TOTAL <br />$1,971,448.00 <br />$2,050,513.40 <br />FORCE ACCOUNT <br />$75,000.00 <br />$75,000.00 <br />TOTAL <br />$2,046,448.00 <br />$2,125,513.40 <br />Bid Form 00310 Page 2 SCHEDULE A <br />P148 <br />