19
<br />Construct County Lift Station, Complete and Operable.
<br />Furnish Pumps Package and Dataflow System. Pump
<br />package will include pumps, cables, guide rails and
<br />assemblies, float assembly, anchor bolts and washers and
<br />nuts, lifting bailes, SS nipples and elbows, float switches,
<br />hatch covers, duplex comtrol panel, SS base plates and
<br />spare parts, concrete drive and housekeeping pad. Lift
<br />Station construction also includes connection to the 4"
<br />force main on the west side of 64th Avenue. The price to
<br />Include Dataflow equipment with the spare Telemetry
<br />Control Unit (TCU) Supply spare parts per IRCDUS
<br />Construction Standards Section 10.
<br />LS
<br />1
<br />$305,625.00
<br />$305,625.00
<br />$203,000.00
<br />$203,000.00
<br />20
<br />Silt Fence
<br />LF
<br />10,000
<br />$1.00
<br />$10,000.00
<br />$1.00
<br />$10,000.00
<br />21
<br />Install CDBG Sign Per detail sheet 10 of 15
<br />EA
<br />1
<br />$1,000.00
<br />$1,000.00
<br />$1,050.00
<br />$1,050.00
<br />22
<br />Maintenance of Traffic
<br />LS
<br />1
<br />$80,000.00
<br />$80,000.00
<br />$127,168.00
<br />$127,168.00
<br />23
<br />Record Drawings/As-built Survey
<br />LS
<br />1
<br />$20,000.00
<br />$20,000.00
<br />$47,000.00
<br />$47,000.00
<br />24
<br />Mobilization, Demobilization
<br />LS
<br />1
<br />$167,000.00
<br />$167,000.00
<br />$90,000.00
<br />$90,000.00
<br />25
<br />Public Construction Bond
<br />LS
<br />1
<br />$20,032.00
<br />$20,032.00
<br />$16,661.00
<br />$16,661.00
<br />SUB -TOTAL
<br />$1,971,448.00
<br />$2,050,513.40
<br />FORCE ACCOUNT
<br />$75,000.00
<br />$75,000.00
<br />TOTAL
<br />$2,046,448.00
<br />$2,125,513.40
<br />Bid Form 00310 Page 2 SCHEDULE A