SECTION 00310-3- SCHEDULE B
<br />SCHEDULE OF BID ITEMS
<br />BID NUMBER 2017-012 Dated: 12/15/16
<br />PROJECT IDENTIFICATION: EAST GIFFORD DRAINAGE PROJECT
<br />BID COMPARISON
<br />Bid Item No.
<br />Item
<br />Unit
<br />Quantity
<br />Blue Goose
<br />Timothy Rose
<br />Unit Price
<br />Total
<br />Unit Price
<br />Total
<br />A.
<br />101-1
<br />Mobilization
<br />LS
<br />1
<br />$5,000.00
<br />$5,000.00
<br />$15,000.00
<br />$15,000.00
<br />102-1
<br />MOT
<br />LS
<br />1
<br />$6,000.00
<br />$6,000.00
<br />$10,085.87
<br />$10,085.87
<br />104-1
<br />Erosion & Water Pollution
<br />LS
<br />1
<br />$3,000.00
<br />$3,000.00
<br />$6,000.00
<br />$6,000.00
<br />110-1-1
<br />Clearing & Grubbing
<br />LS
<br />1
<br />$4,500.00
<br />$4,500.00
<br />$8,800.00
<br />$8,800.00
<br />Mobilization & Demolition Subtotal
<br />$18,500.00
<br />$39,885.87
<br />B. Site Improvements
<br />07
<br />Consruction Stakeout / As -Built
<br />LS
<br />1
<br />$9,600.00
<br />$9,600.00
<br />$12,000.00
<br />$12,000.00
<br />105-1
<br />Testing (Density, Compaction,
<br />Etc.)
<br />LS
<br />1
<br />$21,903.00
<br />$21,903.00
<br />$4,200.00
<br />$4,200.00
<br />120-1
<br />Excavation, Regular (Roadway)
<br />CY
<br />490
<br />$18.00
<br />$8,820.00
<br />$22.00
<br />$10,780.00
<br />285-7-11
<br />(12") Compacted Base
<br />(Limerock or Coquina)
<br />SY
<br />250
<br />$25.85
<br />$6,462.50
<br />$28.00
<br />$7,000.00
<br />334-1-11
<br />Superpave Asphaltic Concrete -
<br />1-1/2" SP 12.5
<br />TN
<br />25
<br />•
<br />$175.00
<br />$4,375.00
<br />$175.00
<br />$4,375.00
<br />425-15-21
<br />Type "C" Ditch Bottom Inlet
<br />(<10' depth)
<br />EA
<br />13
<br />$2,585.00
<br />$33,605.00
<br />$1,600.00
<br />$20,800.00
<br />430-174-215
<br />14" x 23" Horrizontal ERCP
<br />LF
<br />585
<br />$71.50
<br />$41,827.50
<br />$76.06
<br />$44,495.10
<br />430-982-625
<br />14" x 23" MES
<br />EA
<br />1
<br />$1,100.00
<br />$1,100.00
<br />$1,245.00
<br />$1,245.00
<br />530-3-4
<br />Rip -rap rubble, ditch lining
<br />TN
<br />15
<br />$550.00
<br />$8,250.00
<br />$75.00
<br />$1,125.00
<br />570-1-2
<br />Performance Turf (sod, bahia)
<br />CY
<br />3,912
<br />$3.50
<br />$13,692.00
<br />$2.40
<br />$9,388.80
<br />700-1-50
<br />Single Post Sign (Install)
<br />EA
<br />11
<br />$336.00
<br />$3,696.00
<br />$375.00
<br />$4,125.00
<br />700-1-50
<br />Single Post Sign (Relocate)
<br />EA
<br />11
<br />$90.00
<br />$990.00
<br />$175.00
<br />$1,925.00
<br />985-1-1
<br />Geotectile Fabric
<br />LF
<br />18
<br />$40.00
<br />$720.00
<br />$54.00
<br />$972.00
<br />1080-15
<br />Utility Fixtures, Adjust & Modify
<br />EA
<br />3
<br />$632.50
<br />$1,897.50
<br />$600.00
<br />$1,800.00
<br />700-1
<br />Install CDBG Sign (refer to detail
<br />on sheet 10 of 15, West
<br />Wabasso Plans)
<br />EA
<br />1
<br />$1,000.00
<br />$1,000.00
<br />$1,050.00
<br />.$1,050.00
<br />Public Construction Bond
<br />LS
<br />1
<br />$2,795.00
<br />$2,795.00
<br />$2,140.56
<br />$2,140.56
<br />Site Improvements Subtotal
<br />$160,733.50
<br />$127,421.46
<br />TOTAL CONSTRUCTION=
<br />$179,233.50
<br />$167,307.33
<br />Contingency (20%) =
<br />$35,846.70
<br />$33,461.47
<br />TOTAL =
<br />$215,080.20
<br />$200,768.80
<br />Bid Form 00310
<br />Page 3
<br />SCHEDULE B
<br />P149