Laserfiche WebLink
SECTION 00310-3- SCHEDULE B <br />SCHEDULE OF BID ITEMS <br />BID NUMBER 2017-012 Dated: 12/15/16 <br />PROJECT IDENTIFICATION: EAST GIFFORD DRAINAGE PROJECT <br />BID COMPARISON <br />Bid Item No. <br />Item <br />Unit <br />Quantity <br />Blue Goose <br />Timothy Rose <br />Unit Price <br />Total <br />Unit Price <br />Total <br />A. <br />101-1 <br />Mobilization <br />LS <br />1 <br />$5,000.00 <br />$5,000.00 <br />$15,000.00 <br />$15,000.00 <br />102-1 <br />MOT <br />LS <br />1 <br />$6,000.00 <br />$6,000.00 <br />$10,085.87 <br />$10,085.87 <br />104-1 <br />Erosion & Water Pollution <br />LS <br />1 <br />$3,000.00 <br />$3,000.00 <br />$6,000.00 <br />$6,000.00 <br />110-1-1 <br />Clearing & Grubbing <br />LS <br />1 <br />$4,500.00 <br />$4,500.00 <br />$8,800.00 <br />$8,800.00 <br />Mobilization & Demolition Subtotal <br />$18,500.00 <br />$39,885.87 <br />B. Site Improvements <br />07 <br />Consruction Stakeout / As -Built <br />LS <br />1 <br />$9,600.00 <br />$9,600.00 <br />$12,000.00 <br />$12,000.00 <br />105-1 <br />Testing (Density, Compaction, <br />Etc.) <br />LS <br />1 <br />$21,903.00 <br />$21,903.00 <br />$4,200.00 <br />$4,200.00 <br />120-1 <br />Excavation, Regular (Roadway) <br />CY <br />490 <br />$18.00 <br />$8,820.00 <br />$22.00 <br />$10,780.00 <br />285-7-11 <br />(12") Compacted Base <br />(Limerock or Coquina) <br />SY <br />250 <br />$25.85 <br />$6,462.50 <br />$28.00 <br />$7,000.00 <br />334-1-11 <br />Superpave Asphaltic Concrete - <br />1-1/2" SP 12.5 <br />TN <br />25 <br />• <br />$175.00 <br />$4,375.00 <br />$175.00 <br />$4,375.00 <br />425-15-21 <br />Type "C" Ditch Bottom Inlet <br />(<10' depth) <br />EA <br />13 <br />$2,585.00 <br />$33,605.00 <br />$1,600.00 <br />$20,800.00 <br />430-174-215 <br />14" x 23" Horrizontal ERCP <br />LF <br />585 <br />$71.50 <br />$41,827.50 <br />$76.06 <br />$44,495.10 <br />430-982-625 <br />14" x 23" MES <br />EA <br />1 <br />$1,100.00 <br />$1,100.00 <br />$1,245.00 <br />$1,245.00 <br />530-3-4 <br />Rip -rap rubble, ditch lining <br />TN <br />15 <br />$550.00 <br />$8,250.00 <br />$75.00 <br />$1,125.00 <br />570-1-2 <br />Performance Turf (sod, bahia) <br />CY <br />3,912 <br />$3.50 <br />$13,692.00 <br />$2.40 <br />$9,388.80 <br />700-1-50 <br />Single Post Sign (Install) <br />EA <br />11 <br />$336.00 <br />$3,696.00 <br />$375.00 <br />$4,125.00 <br />700-1-50 <br />Single Post Sign (Relocate) <br />EA <br />11 <br />$90.00 <br />$990.00 <br />$175.00 <br />$1,925.00 <br />985-1-1 <br />Geotectile Fabric <br />LF <br />18 <br />$40.00 <br />$720.00 <br />$54.00 <br />$972.00 <br />1080-15 <br />Utility Fixtures, Adjust & Modify <br />EA <br />3 <br />$632.50 <br />$1,897.50 <br />$600.00 <br />$1,800.00 <br />700-1 <br />Install CDBG Sign (refer to detail <br />on sheet 10 of 15, West <br />Wabasso Plans) <br />EA <br />1 <br />$1,000.00 <br />$1,000.00 <br />$1,050.00 <br />.$1,050.00 <br />Public Construction Bond <br />LS <br />1 <br />$2,795.00 <br />$2,795.00 <br />$2,140.56 <br />$2,140.56 <br />Site Improvements Subtotal <br />$160,733.50 <br />$127,421.46 <br />TOTAL CONSTRUCTION= <br />$179,233.50 <br />$167,307.33 <br />Contingency (20%) = <br />$35,846.70 <br />$33,461.47 <br />TOTAL = <br />$215,080.20 <br />$200,768.80 <br />Bid Form 00310 <br />Page 3 <br />SCHEDULE B <br />P149 <br />