My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/07/2017 (4)
CBCC
>
Meetings
>
2010's
>
2017
>
02/07/2017 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2025 12:41:46 PM
Creation date
4/13/2017 12:25:01 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
02/07/2017
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Utility coordination letters will be submitted to franchise utility'operators <br />located within the corridor, requesting information on location, size, etc. <br />related to existing utilities located in the corridor. The information <br />obtained will be reflected in the 50% Submittal. <br />4. Overall project cost estimate, including maintenance of traffic, will be <br />prepared - Submit two hard copies in 8 %Z" x 11" format. <br />5. Letters to billboard owners within the project limits will be submitted <br />following COUNTY review of the 50% Submittal. <br />The 90% and 100% Submittals shall include identifying the species/type, size, location, <br />spacing and quality of all plants. All plant material will consist of drought tolerant/ <br />Florida -Friendly species. The Consultant shall include a written or graphic guide for care <br />and maintenance associated with the plant material after the warranty period. The <br />maintenance plan will be developed in coordination with the COUNTY who will assume <br />maintenance obligation. The Landscape Plans will be developed so as to not require an <br />automated irrigation system. <br />Ano/ Ciihmittni <br />1. A Comment/ Response letter will be prepared addressing each COUNTY <br />50% Submittal design review comment with a descriptive response. <br />2. Submit four 90% Submittal hard copy sets of the landscape plans and <br />specifications in 11" x 17" format. <br />3. MOT plan sheets - Submit four final hard copy sets included in the <br />landscape plans and specifications. <br />4. Letters of 'no conflict' from all utilities within the project limits - Submit <br />two final hard copies of each in 8 %" x 11" format. Include any additional <br />letters omitted in the first submittal. The Department must have two hard <br />copies of all letters prior to the issuance of the Notice to Proceed with <br />Construction. <br />5. Letters to billboard owners within the project limits- Submit two final hard <br />copies of each in 8 %" x 11" format. Include any additional letters omitted <br />in the first submittal. <br />6. Overall project cost estimate, including maintenance of traffic, will be <br />prepared - Submit two hard copies in 8 %" x 11" format. <br />100% Submittal <br />1. A Comment/ Response letter will be prepared addressing each COUNTY <br />90% Submittal design review comment with a descriptive response. <br />2. Submit four 100% Submittal hard copy sets of the landscape plans and <br />specifications in 11" x 17" format. Plan sets shall be signed, sealed and <br />dated if documents are created by a Landscape Architect. <br />3. MOT plan sheets - Submit four 100% Submittal hard copy sets included in <br />Attachment 3 <br />P132 <br />
The URL can be used to link to this page
Your browser does not support the video tag.