My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/07/2017 (4)
CBCC
>
Meetings
>
2010's
>
2017
>
02/07/2017 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2025 12:41:46 PM
Creation date
4/13/2017 12:25:01 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
02/07/2017
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the landscape plans and specifications. If the MOT plan is other than the <br />Department Standard Indices, the plan must be signed, sealed and dated <br />by a Professional Engineer. <br />4. Overall project cost estimate, including maintenance of traffic, will be <br />prepared - Submit two hard copies in 8 %" x 11" format. <br />The following additional data shall be utilized for development of the plans: <br />1. The roadway plans.sheets will be drawn at a scale of 1" = 40' prepared on 11" x <br />17" sheets. <br />2. Plan sheets shall depict existing right-of-way, section lines, property lines, <br />temporary construction easements, and centerline of construction. Horizontal <br />control points with state plane coordinates for all PCs, PT's, curve radius, curve <br />length and horizontal PI's shall be included on the Plan or summarized in an <br />alignment table. <br />3. Utility adjustment sheets are not included in this scope of services and will be <br />negotiated, if required, as a separate agreement at the completion of the design <br />phase. <br />4. Match lines shall not be located within the limits of an intersection. <br />5. All quantities shall reference FDOT Pay Item Numbers. <br />6. All details shall reference FDOT Index Numbers. <br />7. All specifications shall reference to FDOT Specifications for Road and Bridge <br />Construction. Any deviations are special specifications not included in FDOT <br />Specifications are required in the Technical Specifications. <br />8. Initial, interim and Final Plan Submittal shall include the following: <br />L Three (3) Sets of Signed and Sealed Plans. <br />ii. One (1) Opinion of Probable Construction Cost <br />iii. One (1) CD with drawings in PDF format. <br />The plans will be prepared based upon English units. The design will be conducted in <br />MicroStation and Geopak. Final Design files will be provided to the COUNTY in autoCAD <br />format. <br />2. Monument Signage: <br />The Consultant will be provided a monument sign conceptual design template from the <br />COUNTY adequate to understand intent. From this template the ENGINEER will prepare <br />specific design documents indicating the style, size, materials, finishes, etc. necessary to <br />construct the final approved sign. The Consultant will prepare a family of signs (up to 3) <br />based upon the. conceptual design provided. <br />Attachment 3 <br />P133 <br />
The URL can be used to link to this page
Your browser does not support the video tag.