My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/07/2017 (4)
CBCC
>
Meetings
>
2010's
>
2017
>
02/07/2017 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2025 12:41:46 PM
Creation date
4/13/2017 12:25:01 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
02/07/2017
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
[Type text] <br />Priority Classification: High: <br />2. Repair and or replace damaged boardwalk material. Numerous sections <br />of the boardwalk have advanced decay and are completely rotted. In <br />addition, numerous sections of the railing, pickets and deck surface <br />have been broken or damaged due to limbs :and trees that have fallen <br />on the boardwalk as a result of Hurricane Matthew's strong winds. <br />Repairs need to be made throughout the entire boardwalk in affected <br />areas. <br />Scope of work: Includes labor to remove, replace and haul away <br />damaged pieces of boardwalk. County to provide construction materials <br />for repairs to be made. Total estimated personnel hours are 149 hours <br />@ $32.50 per hour. <br />Total labor cost not to exceed: $4,842.50 <br />2 <br />P171 <br />
The URL can be used to link to this page
Your browser does not support the video tag.