Laserfiche WebLink
[Type text] <br />Priority Classification: High: <br />2. Repair and or replace damaged boardwalk material. Numerous sections <br />of the boardwalk have advanced decay and are completely rotted. In <br />addition, numerous sections of the railing, pickets and deck surface <br />have been broken or damaged due to limbs :and trees that have fallen <br />on the boardwalk as a result of Hurricane Matthew's strong winds. <br />Repairs need to be made throughout the entire boardwalk in affected <br />areas. <br />Scope of work: Includes labor to remove, replace and haul away <br />damaged pieces of boardwalk. County to provide construction materials <br />for repairs to be made. Total estimated personnel hours are 149 hours <br />@ $32.50 per hour. <br />Total labor cost not to exceed: $4,842.50 <br />2 <br />P171 <br />