My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/07/2017
CBCC
>
Meetings
>
2010's
>
2017
>
03/07/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2025 1:08:01 PM
Creation date
4/13/2017 12:51:37 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
03/07/2017
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
413
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESOLUTION NO. 2017 - <br />A RESOLUTION OF INDIAN RIVER COUNTY, FLORIDA AUTHORIZING <br />THE PROPER COUNTY OFFICIALS TO ADOPT A RESLOUTION IN <br />SUPPORT OF THE FLORIDA DEPARTMENT OF TRANSPORATION TO <br />MANAGE, CONSTRUCT, AND DELIVER AN INTERCHANGE AT CR- <br />606/OSLO ROAD & SR 9/1-95, FOUR LANE ROADWAY WIDENING OF <br />OSLO ROAD AND REALTED IMPROVEMENTS IN ACCORDANCE <br />WITH THE FLORIDA DEPARTMENT OF TRANSPORATION PROGRAM <br />BULLETIN 15-03 IN COMPLIANCE WITH THE POLICY FOR PROJECTS <br />NOT ON A ROADWAY WITHIN THE STATE HIGHWAY SYSTEM WITHIN <br />THE LOCAL AGENCY'S RIGHT-OF-WAY/LOCAL JURISDICTION AND <br />PROVIDING FOR AN EFFECTIVE DATE. <br />WHEREAS, the Florida Department of Transportation (FDOT) conducted a study <br />of the Strategic Intermodal System (SIS) within FDOT District 4; and <br />WHEREAS, FDOT is authorized by Florida Statutes and Federal funding <br />provisions to undertake projects within the geographical limits of Indian River County; and <br />WHEREAS, those improvements are being managed by the FDOT more <br />particularly described as Financial Project No. 413048-2, which involves the design, <br />acquisition of rights-of-way, construction of an interchange at Oslo Road and 1-95, <br />drainage improvements, reconstruction/relocation of existing roadways, sidewalks, curb <br />ramps, pedestrian crossings, and other related improvements. <br />WHEREAS, the County is in support of the improvements to Oslo Road/CR 606 <br />and SR9/1-95, providing an interchange connection to 1-95 from Oslo Road; and <br />WHEREAS, a resolution to endorse FDOT's delivery of said Project within the local <br />agency's right of way/local jurisdiction is required. <br />NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY <br />COMMISSIONERS OF INDIAN RIVER COUNTY, FLORIDA, that: <br />1. That the Board of County Commissioners of Indian River County, Florida <br />hereby supports the Florida Department of Transportation to manage, construct and <br />deliver, Financial Project No. 413048-2, which involves the acquisition of rights-of-way, <br />construction of an interchange at Oslo Road and 1-95, relocation of 82nd Avenue, cul-de- <br />sac construction on 86th Avenue SW, improvements to 13th Street SW, drainage <br />improvements, reconstruction/relocation of existing roadways, sidewalks, curb ramps, <br />pedestrian crossings, and other related improvements. <br />2. The County Attorney shall review and approve as to form and legal sufficiency all <br />documents prior to their execution by the proper County officials. <br />3. This Resolution shall be in full force and effect upon final passage <br />P139 <br />
The URL can be used to link to this page
Your browser does not support the video tag.