My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/07/2017
CBCC
>
Meetings
>
2010's
>
2017
>
03/07/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2025 1:08:01 PM
Creation date
4/13/2017 12:51:37 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
03/07/2017
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
413
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BLUE Blue QUOTATION/ESTIMATE <br />Goon <br />Loose <br />Construction <br />�Heary CMI (Underground Utlities/ Compkte SleUevelopmentf Marine <br />Project: GRAND HARBOR - St. David's Lane - WATER SERVICE REPLACEMENT PROJECT <br />To: Indian River County Utilities CONTACT: Steve. Bush <br />PHONE: 772-216-1873 <br />Date: January 11, 2017 EMAIL <br />LABOR COSTS <br />Bid <br />Bid Item <br />Estimated <br />Unit of <br />Labor Unit <br />Total Labor <br />Item No. <br />Description <br />quantity <br />Measure <br />Price <br />Price <br />71 <br />Mobilization, Demobilization, MOT <br />1 <br />10 <br />% <br />$7,376.50 <br />23 <br />Test Holes / Potholes <br />84 <br />EA. <br />$250.00 <br />$21,000.00 <br />700 <br />LF <br />$4.80 <br />$3,360.00 <br />Ola <br />Install 1" or 1-1/2"' pe or PVC Service Line <br />300 <br />LF <br />$33.35 <br />$10,005.00 <br />07a <br />Install 24" HDPE Directional Bore <br />Install Water Service Single Short with 2" Saddle and <br />6 <br />EA. <br />$300.00 <br />$1,800.00 <br />18a lCorp <br />Stop at Main <br />Install Water Service Double Short with 2" Saddle and <br />9 <br />EA. <br />$350.00 <br />$3,150.00 <br />18e <br />Corp Stop at Main <br />Install Water Service Single Long with 2" Saddle and Corp <br />7 <br />EA. <br />$425.00 <br />$2,975.00 <br />18g IStop <br />at Main <br />Install Water Service Double Long with 2" Saddle and <br />20 <br />EA. <br />$425.00 <br />$8,500.00 <br />18j <br />Corp Stop at Main <br />181 <br />Install 2" service casing <br />25 <br />EA. <br />$400.00 <br />$10,000.00 <br />Install Asphalt Cement Replacement over full trench <br />width including Base & Sub-grade Compacted to County <br />100 <br />TON <br />$45.00 <br />$4,500.00 <br />67a <br />Specifications <br />86a <br />Lawn Restoration (Topsoil & Sod) up to 12' Wide <br />100 <br />SY <br />$2.25 <br />$225.00 <br />Well Point Dewatering, Each Tier depth up to 25' <br />66a <br />(Minimum 30'X 30' Work Area) <br />2 <br />EA: <br />$3,500.00 <br />$7,000.00 <br />66b <br />Well Points, Additional Points as Needed <br />SO <br />EA. <br />$25.00 <br />$1,250.00 <br />Subtotal <br />SubtotalWaterSystem Labor <br />$81,141.50 <br />Contingency <br />1 % 10% <br />$8,114.15 <br />Labor Total = <br />$89,255.65 <br />ATTACHMENT 3 <br />P148 <br />
The URL can be used to link to this page
Your browser does not support the video tag.