My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-054
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-054
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2017 10:29:50 AM
Creation date
4/20/2017 10:29:49 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
04/18/2017
Control Number
2017-054
Agenda Item Number
8.D.
Entity Name
Kimley-Horn and Assoc.
Subject
Work Order No. 13
Roseland Elevated Tank
Conversion to Repump Station
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f <br /> Task 2—Preparation of Design Drawings and Specifications -Piping,Booster Pump <br /> Station <br /> Consultant will review site constraints with IRCU staff and identify preliminary layouts prior to <br /> preparing final design drawings. <br /> Consultant will prepare design drawings of the site plan and piping,pump station, and tank inlet <br /> piping, watermain extension from Roseland Rd,electrical startersNFD's and control panel, <br /> telemetry, and inlet control valve. <br /> Consultant will prepare 60%and 100%review set of plans consisting of;pump station and yard <br /> piping, connections to the existing storage tank, modification to the existing altitude valve vault, <br /> extension of existing watermain, <br /> Consultant will provide final design of the pump station sized to pump potable water from the <br /> existing elevated storage tank to distribution. Estimated pump capacity is anticipated to be 1,000 <br /> up to 1,500 gpm per pump,however,this is to be determined and finalized with IRCU. <br /> Consultant will size and select a pump type for the pump station. Consultant will design <br /> associated piping, fittings and valves to connect pumps and proposed watermain. <br /> Consultant will design a pump station bypass to allow gravity flow from the storage tanks to <br /> Consultant will design an inlet control valve configuration which will allow filling of the <br /> elevated ground storage tank at a variable flow under a constant head condition. The valve will <br /> be designed to maintain a fixed influent pressure,but will have flexibility to modulate to provide <br /> constant fill rate as well. The facility will also have the ability to bypass the elevated tank under <br /> non-standard events. <br /> Design drawings will consist of; <br /> • Cover sheet <br /> • Overall site plan- tank,pump station <br /> • Tank piping plan and details(x2) <br /> • Pump details and inlet piping(x2) <br /> • Process Piping and Instrumentation Diagram&Legend <br /> • Details(2) <br /> • Electrical schematics,design,and details(under separate task) <br /> Consultant will provide four(4)printed hard copies at each review and electronic version in pdf <br /> and Word format for review. <br /> Consultant will attend up to two(2)review meetings to discuss review comments and <br /> incorporate Owner comments with IRCU staff. <br />
The URL can be used to link to this page
Your browser does not support the video tag.