CR 512 RESURFACING-FM No.431160-1-54-01 Page-4- <br /> IRC PROJECT No.1139 <br /> AACE Proposal No.P17-758 <br /> FEESCHEDULE <br /> ► ITEM#1:Preparation of FDOT Earthwork Density Log Book <br /> • Project Engineer;15 hours @$95.00/hour .. ... .. .. .. .. .. .... .... ... .. $1,425.00 <br /> • Senior Project Engineer;1 hour @$110.00/hour ... .. . .. .... ... .. 110.00 <br /> Item#1 Subtotal: . ... ... ... .. ... ...... .. ... ..... ..... . $1,535.00 <br /> • ITEM#2:Coordination of the Delivery and Testing Roadway Aggregate <br /> Samples by PRI Asphalt Technologies(Mix Design Determination) <br /> • Project Engineer;6 hours @$95.00/hour .. ... ... . .... ... . $570.00 <br /> • Senior Field Technician;12 hours @$55.00/hr. $660.00 <br /> • PRI Mix Design Testing;2 tests(')@$6,800.00/test+ 15% .... .... ... . . ... .... .$15,640.00 <br /> • UPS Packaging and Ground Shippine;Lump sum estimate ... ..... ... .. .. .. $750.00 <br /> Item#2 Subtotal: . .... .. ... .... .. ... .. ...... ... .. ... . $17,620.00 <br /> ► ITEM#3: Man-Hour Estimate(Field Testing of FDR Roadway Base and Shoulders and <br /> QC Services During Paving Operations) <br /> We understand that the majority of QC services will be performed by Indian River County personnel. Services that <br /> RACE will perform are detailed below As indicated in a project addendum,our man-hour fee estimate is based on <br /> daytime work only <br /> • In-Place Density Testing of FDR Mix and Refurbished Shoulders; <br /> -100 tests @$23.00/test(minimum 4 tests per hour,per trip) .. . . ... ... $2,300.00 <br /> • Non-Structural Concrete Testing-Senior Field Technician;20 hours @$55.00/hr. $1,100.00 <br /> • Senior Field Technician(for Roadway Coring-2 techs required for all coring); <br /> - 120 hours @$55.00/hour . . ... ... . .. .. . .... .. .. .$6,600.00 <br /> • Snr.Project Engineer: <br /> - Limited Meeting Attendance-3 meetings x 2 hrs./mtg x$110.00/hour.. ... . $660.00 <br /> - Project Coordination,review of testing results;28 weeks x 1.5 hrs./week x$110.00/hour $4,620.00 <br /> • Technical Secretary;28 weeks x 1.5 hrs./week x$48.00/hour . .. ..... .. .. $2,016.00 <br /> Item#3 Subtotal: . ... ... ... ..... . ... .. .. .. . .... .. .... $17,296.00 <br /> ITEM#4:Structural Number of FDR Base Determination(): <br /> • Roadway coring; <br /> - Twelve(12)coring mobilizations @$100.00/day . $1,200.00 <br /> - Generator/core machine rental;12 days @$150.00/day .... $1,800.00 <br /> - Senior Field Technician(for Roadway Coring-2 techs required for all coring); <br /> 100 hours @$55.00/hour . $5,500.00 <br /> • Project Engineer;6 hours @$95.00/hour $570.00 <br /> .. ... .. . .. .. ... .. . <br /> • PRI Structural Number Verification Testing;12 tests @$1,645.00/test+ 15% . .. .. $22,701.00 <br /> • Technical Secretary;20 hours @$48.00/hour .. .. . . . .. ... . $960.00 <br /> • UPS Ground Shipping;Lump sum estimate .... ... . . . .. $500.00 <br /> Item#4 Subtotal: ... .. . ... .. ... .. . ... .. ... . .. ... .. ... $33,231.00 <br /> • ITEM#5:Laboratory Testing Estimate(4): <br /> • Road Base Particle Size Analysis of Pulverized Base:30 tests @$95.00/test .. .. .$2,850.00 <br /> • Marshall Stability of FDR Mixture:55 tests @$130.00/test.. ... .. .... ... .$7,150.00 <br /> • Moisture/Density Relationship Testing:55 tests @$85.00/test .. $4,675.00 <br /> • LBR Testing;25 tests @$295.00/test $7,375.00 <br /> • Extraction/Gradation and Asphalt Content Testine;20 samples @$190.00/sample ...$3,800.00 <br /> • Roadway coring; <br /> - 10 coring mobilizations @$100.00/day .... .. ...$1,000.00 <br /> - Generator/core machine rental;10 days @$150.00/day .. .. . .. $1,500.00 <br /> - Specific Gravity Testing of cored samples;20 cores @$35.00/core $700.00 <br /> Item#5 Subtotal: ... ...... .. ... ...... .. .... .. ... ..... $292050.00 <br /> PROTECT TOTAL: 9$$ ,732,U0 <br />