Laserfiche WebLink
CR 512 RESURFACING-FM No.431160-1-54-01 Page-5- <br /> IRC PROJECT No.1139 <br /> RACE Proposal No.P17-758 <br /> NOTES: (1) Two aggregate samples are needed for mix design testing due to thicker asphalt being <br /> reported along a portion of the alignment. <br /> (2) UPS Ground shipping based on estimated weight of samples of 60 lbs. <br /> (3) We have assumed that coring of the FDR base course for Structural Number <br /> verification will performed on 12 separate occasions. <br /> (4) Laboratory testing quantities are based on the requirements listed in Section 330 of <br /> the Standard Specifications for Road and Bridge Construction, on the <br /> Developmental Specification T332 Full Depth Reclamation and on the estimated <br /> quantities listed on the Itemized Bid Schedule. <br /> (5> No asphalt plant testing/inspections are included within this proposal;we anticipate <br /> that the selected contractor will perform QC services at the plant. Only specific <br /> gravity testing of asphalt cores (obtained during paving operations) and gradation <br /> testing are included herein <br /> TERMS AND CONDITIONS <br /> (1) Unit rates apply to standard working days,Monday through Friday,7.00 a.m to 6:00 p.m. Testing and <br /> hourly rates will be increased by 50%for weekend,holiday or after-hours services(i.e.,services performed <br /> before 7.00 am or after 7.00 pm) Our man-hour rates as presented herein are based on day-time testing <br /> only No allowances for nighttime work are reflected in our fee. <br /> (2) If our testing estimate for a specific work element is insufficient for that particular activity,resources from <br /> another work element can be used without prior authorization from the client as long as our total cost <br /> estimate is not exceeded. We will notify you in advance if it appears that the cost estimate presented in <br /> the attached unit fee schedule will be exceeded. <br /> (3) AACE has not been provided with the selected Contractor's proposed schedule(i.e.,paving days,FDR <br /> days, etc.) Therefore, man-hours and associated testing quantities are based on our experience with <br /> similar projects. It is possible that our testing budget may require revision based on contractor efficiency, <br /> methodology and scheduling <br /> (4) Soil sample and concrete cylinder pickup for laboratory testing(e.g.,Proctor,LBR testing,compressive <br /> strength,etc.)will be billed at$55.00/hour if not scheduled with other work. <br /> (5) Our services do not include reviewing,monitoring or reporting any aspect of the required Maintenance <br /> of Traffic(M.O.T) that may be required for this project. <br />