Laserfiche WebLink
PROPOSED WORK PLAN <br />7. WORK PLAN <br />Measurable Objectives <br />1. Improve statistical management <br />and operational data for county- <br />wide ALS program by obtaining a <br />computer work station and <br />associated equipment <br />2. Expand communications for EMS <br />Chief by providing alternative <br />means of communications by <br />obtaining a 800 Mhz Trunking <br />mobile radio <br />3. Improve communications for EMS <br />field personnel by providing <br />a portable UHF GE MPD Radio <br />4. Improve method of alerting two <br />stations by providing decoders <br />at two field service locations <br />5. Expand capabilities of field <br />radio equipment by obtaining <br />a vehicle mounted battery <br />charger for portable radios <br />6. Improve field communications <br />for portable radios by <br />obtaining and installing an <br />EMS satellite receiver with <br />battery and UPS <br />7. Improve existing satellite <br />receiver by adding battery <br />backup capability <br />8. Improve emergency transport <br />vehicle by obtaining and <br />installing an air ride <br />suspension kit for vehicle <br />9. Improve EMS training by <br />upgrading Trauma Kelly to <br />Mega Code Kelly <br />10. Network software package <br />and installation of soft- <br />ware and hardware <br />Tim• Frames <br />Computer equipment would <br />be obtained within 90 <br />days of contracting <br />Radio would be obtained <br />and installed within <br />90 days of contracting <br />Portable radio would be <br />obtained within 90 days <br />of contracting <br />Decoders would be <br />installed within 90 days <br />of contracting <br />Charger would be obtained <br />and installed within 90 <br />days of contracting <br />Equipment would be <br />obtained and installed <br />within 90 days of <br />contracting <br />Battery backup system <br />would be obtained and <br />installed within 90 <br />days of contracting <br />Air ride suspension <br />unit would be obtained <br />and installed within <br />90 days of contracting <br />Equipment would be <br />obtained within 90 days <br />of contracting <br />Installation would be <br />completed within 90 days <br />of contracting <br />