Laserfiche WebLink
• Temporary (Short Term) Lane closures will be restricted during peak hour traffic from 7:00-9:00 <br />AM and 4:00-6:00 PM. Night work is not being considered at this time but could be allowed. The <br />bids should be submitted based on daytime work. One lane in each direction will be allowed to <br />be closed permanently during construction. Temporary lane closures will be allowed except <br />during the peak hour of traffic as previously stated. <br />• It is being determined at this time as to whether the roadway testing will need to be done by the <br />Asphalt Institute because of the excessive time involved on their behalf. An addendum will be <br />issued if the Asphalt Institute will not be the testing lab. If the Asphalt Institute is the testing lab <br />that will be utilized and there is an excessive amount of delay for testing, the County will take that <br />into consideration with regard to the contract time. <br />• Meeting adjourned. <br />ATTACHED: Sign In Sheet <br />Page 3 <br />F\Public Works\ENGINEERING DIVISION PROJECIS\I 139 -CR 512 Wbnd Resurfacing Roseland Rd to US I-SCOP\Design\Meetings\Pre- <br />Bid \IRC 1 139 CR 512 Pre-l3id Meeting Minutes 20170130.doc <br />