Laserfiche WebLink
UTILITIES <br />Florida Power and Light, Co <br />ATT <br />IRC Utilities <br />Comcast Cable Communications, Inc. <br />Other coordination: <br />IRC Traffic Engineering <br />OTHER ISSUES <br />• Maintenance of Traffic: <br />o Contractor shall submit a Maintenance of Traffic Plan, signed and sealed by a Florida <br />Professional Engineer, to the Indian River County - Engineering Division for approval <br />o Access for school, businesses and residences shall be maintained at all times. <br />o Traffic shall be maintained at all times. <br />o The Maintenance of Traffic Plan shall meet, at a minimum, the FDOT Index 600, July, 2016 <br />edition and the most current MUTCD. <br />• Environmental permit St Johns River Water Management District is exempt. <br />• Sidewalk—true 6" concrete, 2% max slope (no tolerance). <br />• Testing per- FDOT specifications. (Andersen Andre Consulting Engineers, Inc.). <br />• Curb cut ramps in accordance with FDOT Index. <br />• School buses, sanitation & US Postal Service must be maintained. <br />• Addendums if required — review and comment as soon as possible, no further comments or <br />questions 10 days prior to bid opening (Sunday, February 5th, 2017). <br />PROJECT REQUIREMENTS: <br />• Invoicing shall be submitted on monthly basis. <br />• James Ennis indicated that he would verify what, if any, requirements were with respect to <br />certified payroll or EEO requirements. <br />o POST -MEETING CLARIFICATION: EEO and Certified Payroll will not be required as part of <br />this contract. All requirements are set forth in the Bid Package. <br />• Contractors must meet deadlines in order to be in compliance. All deadlines are strictly enforced <br />or reimbursements cannot be made. <br />• All required forms must be completed and on time or payment could be withheld. <br />• Summary of required contractor form submittals checklist (Section 00200, Article 15 —Submittal <br />of Bid in contract documents). <br />DISCUSSION <br />• The concrete for the sidewalk shall be fiber mesh reinforcement. <br />• The testing lab as noted above has not be retained yet but it is anticipated they will be performing <br />the testing. <br />• The County is currently waiting on the F.E.C. Railroad for their concurrence to perform work <br />within their right of way. <br />• This project involves full depth reclamation and will involve asphalt injection as part of the <br />process. <br />Page 2 <br />F\Public Works \ENGINE RING DIVISION PROJECTS\I 1 39 -CR 512 Wbnd Resurfacing -Roseland Rd to IJS I-SCOP\Design \Meetings\Pre- <br />Bid \IRC 1139_02 512_Pre-Bid Meeting Minutes_20170130 doe <br />