My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-056B
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-056B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2017 10:10:21 AM
Creation date
5/16/2017 12:18:10 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
04/18/2017
Control Number
2017-056B
Agenda Item Number
12.F.1
Entity Name
Timothy Rose Construction
Subject
CR 512 Westbound Resurfacing
CR 512 Eastbound Resurfacing
Area
Roseland Road to US1 Easy St. to US1
Project Number
1139
Bid Number
2017034
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UTILITIES <br />Florida Power and Light, Co <br />ATT <br />IRC Utilities <br />Comcast Cable Communications, Inc. <br />Other coordination: <br />IRC Traffic Engineering <br />OTHER ISSUES <br />• Maintenance of Traffic: <br />o Contractor shall submit a Maintenance of Traffic Plan, signed and sealed by a Florida <br />Professional Engineer, to the Indian River County - Engineering Division for approval <br />o Access for school, businesses and residences shall be maintained at all times. <br />o Traffic shall be maintained at all times. <br />o The Maintenance of Traffic Plan shall meet, at a minimum, the FDOT Index 600, July, 2016 <br />edition and the most current MUTCD. <br />• Environmental permit St Johns River Water Management District is exempt. <br />• Sidewalk—true 6" concrete, 2% max slope (no tolerance). <br />• Testing per- FDOT specifications. (Andersen Andre Consulting Engineers, Inc.). <br />• Curb cut ramps in accordance with FDOT Index. <br />• School buses, sanitation & US Postal Service must be maintained. <br />• Addendums if required — review and comment as soon as possible, no further comments or <br />questions 10 days prior to bid opening (Sunday, February 5th, 2017). <br />PROJECT REQUIREMENTS: <br />• Invoicing shall be submitted on monthly basis. <br />• James Ennis indicated that he would verify what, if any, requirements were with respect to <br />certified payroll or EEO requirements. <br />o POST -MEETING CLARIFICATION: EEO and Certified Payroll will not be required as part of <br />this contract. All requirements are set forth in the Bid Package. <br />• Contractors must meet deadlines in order to be in compliance. All deadlines are strictly enforced <br />or reimbursements cannot be made. <br />• All required forms must be completed and on time or payment could be withheld. <br />• Summary of required contractor form submittals checklist (Section 00200, Article 15 —Submittal <br />of Bid in contract documents). <br />DISCUSSION <br />• The concrete for the sidewalk shall be fiber mesh reinforcement. <br />• The testing lab as noted above has not be retained yet but it is anticipated they will be performing <br />the testing. <br />• The County is currently waiting on the F.E.C. Railroad for their concurrence to perform work <br />within their right of way. <br />• This project involves full depth reclamation and will involve asphalt injection as part of the <br />process. <br />Page 2 <br />F\Public Works \ENGINE RING DIVISION PROJECTS\I 1 39 -CR 512 Wbnd Resurfacing -Roseland Rd to IJS I-SCOP\Design \Meetings\Pre- <br />Bid \IRC 1139_02 512_Pre-Bid Meeting Minutes_20170130 doe <br />
The URL can be used to link to this page
Your browser does not support the video tag.