My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/18/2017 (2)
CBCC
>
Meetings
>
2010's
>
2017
>
04/18/2017 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2025 1:28:02 PM
Creation date
5/22/2017 11:31:18 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
04/18/2017
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00948 - Work Change Directive No. 02 <br />DATE OF ISSUANCE: March 21, 2016 EFFECTIVE DATE: March 21, 2016 <br />OWNER: Indian River County <br />CONTRACTOR: Kerns Construction & Property Management Corporation <br />Project: 87th Street and 91stAvenue Sidewalk Improvements <br />OWNER's Project No. 1205 <br />OWNER's Contract No. 2015036 <br />You are directed to proceed promptly with the following changes: <br />Description: <br />Due to unknown existing conditions of off-site drainage, modifications to the proposed <br />drainage system are necessary. <br />Purpose of Work Change Directive: <br />To address the existing off-site drainage pattern on 91st Avenue that was not previously known <br />in the vicinity of Stations 52+00 and 56+00. <br />Attachments: (List documents supporting change) <br />Revised plan sheet 14 of 51 for 91st Avenue; Revision Date: 3/10/16 <br />Kerns Construction proposal 1205 — CA02 dated 3/16/16 <br />If OWNER or CONTRACTOR believe that the above change has affected Contract Price any <br />Claim for a Change Order based thereon will involve one or more of the following methods as <br />defined in the Contract Documents. <br />Method of determining change in <br />Contract Prices <br />X Unit Prices <br />X Lump Sum <br />0 Other. <br />II By Change Order: <br />Method of determining change in <br />Contract Times <br />0 Contractor's Records <br />II Engineer's Records <br />X Other: Remove and Re -install Drainage Pipes. <br />0 By Change Order. <br />Estimated increase (decrease) of this Work Estimated increase (decrease) in Contract Times: <br />Change Directive <br />$9.023.30 Substantial Completion: 7 additional days; 5/4/16 <br />If the change involves an increase, the estimated <br />amount is not to be exceeded without further <br />authorization. <br />Ready for Final Completion - 6/4/16 <br />If the change involves an increase, the estimated <br />time is not to be exceeded without further <br />authorization. <br />ACCEPTED: <br />RECOMMENDED: <br />APPROVED: <br />gy: �J <br />By: <br />CONTRACTOR (Signature) <br />ENGINEER (Signature) <br />OWNER (Signature) <br />Date: 3%2� itf, <br />Date: 3Z-2_1116 <br />11 <br />Date: SZ� <br />* * END OF SECTION * * <br />C:\Users\rszpyrka\Des1dop\1205 - 87th Street & 91st Avenue -Work Change Directive #2 032116.pdtdoc <br />P131 <br />
The URL can be used to link to this page
Your browser does not support the video tag.