My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/18/2017 (2)
CBCC
>
Meetings
>
2010's
>
2017
>
04/18/2017 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2025 1:28:02 PM
Creation date
5/22/2017 11:31:18 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
04/18/2017
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
#KERNS <br />C 0 N S T R U C T 1 0 N <br />1205 VLE SIDEWALKS - 87TH STREET & 91ST AVENUE <br />CONTINGENCYADJUSTMENTNUMBER TWO - STORMMODIFICATIONS STA 52+00 - 57+00 <br />Cate of: Mr. Richard Szpyrka, P.E. <br />Indian River County, Engineering Division Proposal: 1205 - CA02 <br />180127th Street Date: 3/16/2016 <br />Vero Beach, FL 32960 EOR Indian River County <br />772-226-1221 AHJ: Indian Rivet County <br />rszpyLka@ircga-,,.com <br />PROPOSED SCnPR OF WORK <br />Item <br />Description <br />EST. QTY <br />UNIT <br />RATE <br />AMOUNT <br />430-174-112 <br />PIPE CULVERT ACMP (ROUND)(12" SD) <br />90 <br />LF <br />$26.40 <br />$2,376.00 <br />430 -174 -112A -A <br />PIPE CULVERT RCP (ROUND)(12" SD) (REMOVE <br />EXISTING) <br />135 <br />LF <br />$5.20 <br />$702.00 <br />430 -174 -112A -B <br />PIPE CULVERT RCP (ROUND)(12" SD) (REINSTALL <br />EXISTING) <br />135 <br />LF <br />$23.00 <br />$3,105.00 <br />430-984-121 <br />MITERED END SECTION (OTHER SD) (121) <br />2 <br />EA <br />$660.00 <br />$1,320.00 <br />522-2A <br />REMOVAL & REINSTALLATION OF FORMBOARDS <br />1 <br />LS <br />$400.00 <br />$400.00 <br />120-6A <br />RE -GRADING OF SIDEWALK PADS <br />1 <br />LS <br />$300.00 <br />$300.00 <br />PROPOSAL SUBTOTAL $8,203.00 <br />10% OVERFLEW & PROFIT ,$820.30 <br />GRAND TOTAL $9,023.30 <br />CONTRACT TIMES <br />SUBSTANTIAL COMPLETION DATE 4/27/2016 <br />PROPOSED TIME EXTENSION (THIS REQUEST) 7 CAL DAYS <br />PROPOSED REVISED SUBSTANTIAL COMPLETION DATE 5/4/2016 <br />Proposal Notes & Cladfications <br />1 QmanA es are bared on revised plan sheet 14 ax e-mailed on 3-11-16. <br />2701 Industrial Avenue, Ft. Pierce, FL 34946 •772-985-5015 (0) 772-209-7700 (F) <br />State Certified General Contractor CGC 059365 <br />i <br />P132 <br />
The URL can be used to link to this page
Your browser does not support the video tag.