My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-081
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-081
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2017 9:58:44 AM
Creation date
5/24/2017 9:58:38 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
05/23/2017
Control Number
2017-081
Agenda Item Number
8.H.
Entity Name
Bowman Consulting Group LTD
Subject
Pavement Reclamation
Resurfacing Project
Area
58th Ave.
Project Number
2016016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
see this team as the core personnel performing the services and we will augment this group with other qualified <br /> staff, if and as needed arises. <br /> Introduction to Key Personnel: <br /> To form a successful team requires management ability, qualified personnel and a common goal. We have <br /> worked with Lassiter Transportation Group for over four years and have an established relationship with them <br /> and they share the same approach to work and quality,and we have the ability to work together seamlessly. We <br /> have added Bechtol Engineering and Testing and Evers Infrastructure Group because of their extensive <br /> experience with Full Depth Reclamation (FDR)as well as other pavement recycling methods. <br /> In this section we introduce each of our key team members and the skill sets that they have to apply to the design <br /> of the project. We also highlight the types of tasks that each team member will focus on. At the end of this <br /> section,we have included each team member's resume for your review. <br /> Eric Flavell, P.E.—Project Manager&Senior Design Engineer <br /> As project manager Mr. Flavell will be the single point of contact for the county <br /> and have overall responsibility of the project. He brings over 30 years of road 3 = <br /> design and construction experience to this project. He will oversee all aspectes ` <br /> of the design teams work and is familiar with what each team member needs <br /> to produce for a complete and integrated design. He will draw on his road <br /> design and pavement maintenance experience to see that the project r <br /> challenges are addressed during the course of the design process. <br /> Mr. Flavell has worked on a variety of road settings including downtown, rural <br /> and neighborhood. Each has it own nuance and these considerations ( ,_ <br /> including how the work can be phased and the importance of project I <br /> sequencing go a long way to reducing impacts to the traveling public. <br /> Mr. Flavell is a registered professional engineer in four states, including <br /> Florida. He recently moved to Florida and is in the process of getting FDOT ' <br /> Pre-qualifications for Catagories 3.1, 3.2, 10.1 and 13.6. Through his <br /> accomplishments, he has been elected to Fellow in the American Society of d <br /> Civil Engineers, and Fellow in the Institue for the Advancement of Engineering. <br /> Lucas Anthony_, P.E.—Project Engineer(Permitting and Utility Coordination) <br /> Mr. Anthony brings over 18 years of engineering and project management <br /> experience to the project. The bulk of this experience has been with land <br /> ` development projects focusing on big box projects such as Walmart. These types <br /> of projects are the most demanding from a permitting and utility coordination <br /> perspective.. Time is always critical to successful development, and permitting <br /> is typically the critical path to project delivery. The most reliable way to maintain <br /> an established project schedule and process permits in an expedient manner is <br /> to develop trusting relationships with the various overseeing agencies. <br /> h Understanding the process, pre-submittal meetings, preparation of complete <br /> packages and candid discussions throughout the process, are what expedite <br /> permitting. <br /> Mr. Anthony has significant experience with following functions: <br /> • Due diligence research of existing conditions, permit requirements, concurrency, local land development <br /> regulations, drainage and environmental conditions <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.