My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-081
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-081
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2017 9:58:44 AM
Creation date
5/24/2017 9:58:38 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
05/23/2017
Control Number
2017-081
Agenda Item Number
8.H.
Entity Name
Bowman Consulting Group LTD
Subject
Pavement Reclamation
Resurfacing Project
Area
58th Ave.
Project Number
2016016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Creek which runs adjacent to the site and crosses the site. During flood stage it is not uncommon for water to overflow the <br /> banks and inundate the site. The banks in fact are higher than a significant portion of the site. To protect the site from <br /> higher creek flows that are not overtopping the drainage system goes to a manhole and the storm drain is fitted with a check <br /> valve to prevent water from backing into the site. The system has been tested and functioned well in significant storms. <br /> Being a transportation hub, the site has to accommodate pedestrians, vehicles and busses. As many as five busses can <br /> be staged at the station. <br /> Project Completed in 1995 <br /> Santa Paula Railroad Station,City of Santa Paula, CA <br /> Award Winning Project—Santa Paula Chamber of Commerce Civic Beautirication of the Year <br /> - Mr. Flavell served as principal in charge and project manager and engineer of record for site improvements. Santa Paula <br /> is a unique small community in that it has an airport and its own railroad line. The railroad station was built in the 1930s <br /> and is a historic landmark. The site was generally undeveloped, except for some warehouses and packing plants nearby. <br /> Its location near the heart of town made this site a candidate for restoration. This project required designing the station <br /> platform in accordance with railroad standards. The project included a gazebo and park. The architect selected brick for <br /> the accent pavement areas, which included sidewalks adjacent to the street. A key element of the design of this project <br /> was design of ADA compliance and addressing the grade difference across the site. We developed a unique mountable <br /> curb to provide access to the original loading ramp and accommodate the sidewalk requirements. <br /> Project Completed in 2008 <br /> i <br /> 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.