My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-081
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-081
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2017 9:58:44 AM
Creation date
5/24/2017 9:58:38 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
05/23/2017
Control Number
2017-081
Agenda Item Number
8.H.
Entity Name
Bowman Consulting Group LTD
Subject
Pavement Reclamation
Resurfacing Project
Area
58th Ave.
Project Number
2016016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Manager and Engineer of Record, Design Services, US 41 Venice Bypass, Florida <br /> Department of Transportation,District 1,Sarasota County,FL: Mr. Neiman prepared the construction <br /> plans for the widening of the US 41 Venice Bypass. His design included realignment and reconstruction of <br /> the existing four-lane with six-lane urban typical sections.Design of a closed stormsewer system, and five <br /> stormwater treatment facilities, community involvement,traffic volume studies and projections, roundabout <br /> feasibility studies, coordination with utility owners and wetland impacts and mitigation were an integral part <br /> of the project. Maintenance of traffic plans, signing and marking plans and traffic signal plans for five <br /> signalized intersections with left turn phasing were also included in the scope of work. <br /> I <br /> 29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.