9. Engineer will included field review at the start of the project that includes walking <br /> the road and photographing driveway geometry for a record of existing <br /> conditions. <br /> 10 Meeting notes will be used to memorialize decisions made throughout the design <br /> process. No summary report will be prepared <br /> Deliverables: <br /> (1 copy) —AutoCAD Master Plan drawing of proposed improvements in digital form on <br /> CD. <br /> Final Design <br /> 11. Permitting. <br /> Prior to preparation and submittal of the necessary permit applications the Engineer <br /> will attend up to one (1) pre-application meeting, and one (1) review meeting for each <br /> agency identified below. The permit applications will be submitted to the various <br /> agencies as soon as the drawings are completed to the extent they can be <br /> submitted. Any applications requiring signature will be routed to the County for <br /> signature. The Engineer assumes all permit application fees will be paid by the <br /> County. The Engineer anticipates up to two (2) rounds of reasonable comments <br /> from each agency during the permitting review process. The Engineer will prepare <br /> and submit the following permit applications for the work within the project area: <br /> a. St. John's River Water Management District(SJRWMD) Environmental <br /> Resource Permit(ERP) <br /> The scope assumes an Exemption will be allowed under 26-330.051 F.A.C. <br /> for the linear FDR portion of the project. The Engineer assumes that the <br /> existing roadside swale system has sufficient capacity to accommodate the <br /> increased impervious area with minor changes such as adjusting volume <br /> retained in the swales. Design and permitting of new stormwater treatment <br /> features through SJRWMD is specifically excluded from this scope. <br /> b. Indian River Farms Water Control District(IRFWCD) Permit <br /> The Engineer anticipates that culvert extensions and replacements and <br /> possibly new culverts will be required within the IRFWCD canals within the <br /> project area. The Engineer will prepare and submit permit applications as <br /> needed to support the work within the project area <br /> c. FDEP NPDES Generic Permit for Stormwater Discharge from Large and <br /> Small Construction Activities <br /> The Engineer will assist the County's Contractor in preparing and submitting <br /> the Notice of Intent (NOI) for the proposed project. The Engineer at this time <br /> assumes that any dewatering required for the project can occur under the <br /> terms of the Generic Permit (i.e. no contaminated site exists within 500 feet of <br /> the areas to be dewatered.) <br /> BCG INITIAL CLIENT INITIAL <br /> Page 4 of 14 <br />