My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-081
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-081
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2017 9:58:44 AM
Creation date
5/24/2017 9:58:38 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
05/23/2017
Control Number
2017-081
Agenda Item Number
8.H.
Entity Name
Bowman Consulting Group LTD
Subject
Pavement Reclamation
Resurfacing Project
Area
58th Ave.
Project Number
2016016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9. Engineer will included field review at the start of the project that includes walking <br /> the road and photographing driveway geometry for a record of existing <br /> conditions. <br /> 10 Meeting notes will be used to memorialize decisions made throughout the design <br /> process. No summary report will be prepared <br /> Deliverables: <br /> (1 copy) —AutoCAD Master Plan drawing of proposed improvements in digital form on <br /> CD. <br /> Final Design <br /> 11. Permitting. <br /> Prior to preparation and submittal of the necessary permit applications the Engineer <br /> will attend up to one (1) pre-application meeting, and one (1) review meeting for each <br /> agency identified below. The permit applications will be submitted to the various <br /> agencies as soon as the drawings are completed to the extent they can be <br /> submitted. Any applications requiring signature will be routed to the County for <br /> signature. The Engineer assumes all permit application fees will be paid by the <br /> County. The Engineer anticipates up to two (2) rounds of reasonable comments <br /> from each agency during the permitting review process. The Engineer will prepare <br /> and submit the following permit applications for the work within the project area: <br /> a. St. John's River Water Management District(SJRWMD) Environmental <br /> Resource Permit(ERP) <br /> The scope assumes an Exemption will be allowed under 26-330.051 F.A.C. <br /> for the linear FDR portion of the project. The Engineer assumes that the <br /> existing roadside swale system has sufficient capacity to accommodate the <br /> increased impervious area with minor changes such as adjusting volume <br /> retained in the swales. Design and permitting of new stormwater treatment <br /> features through SJRWMD is specifically excluded from this scope. <br /> b. Indian River Farms Water Control District(IRFWCD) Permit <br /> The Engineer anticipates that culvert extensions and replacements and <br /> possibly new culverts will be required within the IRFWCD canals within the <br /> project area. The Engineer will prepare and submit permit applications as <br /> needed to support the work within the project area <br /> c. FDEP NPDES Generic Permit for Stormwater Discharge from Large and <br /> Small Construction Activities <br /> The Engineer will assist the County's Contractor in preparing and submitting <br /> the Notice of Intent (NOI) for the proposed project. The Engineer at this time <br /> assumes that any dewatering required for the project can occur under the <br /> terms of the Generic Permit (i.e. no contaminated site exists within 500 feet of <br /> the areas to be dewatered.) <br /> BCG INITIAL CLIENT INITIAL <br /> Page 4 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.