My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-081
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-081
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2017 9:58:44 AM
Creation date
5/24/2017 9:58:38 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
05/23/2017
Control Number
2017-081
Agenda Item Number
8.H.
Entity Name
Bowman Consulting Group LTD
Subject
Pavement Reclamation
Resurfacing Project
Area
58th Ave.
Project Number
2016016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Limits of work: <br /> • 58th Avenue from the southerly edge of 57th Street to the <br /> southerly edge of CR-510 <br /> • 691h Street as required for conform to intersection geometric <br /> changes estimated at 850' in each direction on 69th street <br /> 17. Engineer will incorporate General Provisions provided by the County, and <br /> prepare Special Provisions (Technical Specifications) in County Public Works <br /> Department format. In addition to the technical specifications for proposed <br /> materials and methods. Prepare unit price bid schedule with bid descriptions <br /> describing the work for each bid item. Prepare technical specifications in MS <br /> Word format. <br /> 18 Engineer will develop one engineer's opinion of construction cost at <br /> approximately 90% milestone and make adjustments for final submittal. Cost <br /> breakdown will match the bid schedule. <br /> 19. Perform field review of drawings to evaluate design with existing conditions. <br /> Deliverables: <br /> Drawings (90%) <br /> (1 copy) — Full size and (3 copies) — Reduced size on bond <br /> Drawings (Final Plans) <br /> Specs <br /> (1 Copy) on bond unbound, (1 copy) on CD each submittal <br /> Opinion of Construction Cost in Bid Schedule Format at 90% and final <br /> (1 Copy) on bond <br /> Post Design Services <br /> 20. Attend Pre-Bid Conference <br /> 21. Engineer will respond to bidders' questions and assist with the preparation of <br /> addenda. <br /> Construction Services <br /> 22. To be determined (not included in this contract) <br /> BCG INITIAL CLIENT INITIAL <br /> Page 6 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.