My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-079
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-079
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2017 10:29:22 AM
Creation date
5/30/2017 4:37:35 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
05/16/2017
Control Number
2017-079
Agenda Item Number
15.B.4.
Entity Name
Geosyntec Consultants, Inc.
Subject
Work Order No. 6 Amended from Work Order No. 5
Area
Gifford Landfill
Document Relationships
2017-124
(Cover Page)
Path:
\Official Documents\2010's\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(]eosyntec �, 6770 South� Titusville,Florida 32780 <br /> P11 321 269 5880 <br /> consultants FAX 321.269.5813 <br /> \vwwgeosyntec.coin <br /> 5 May 2017 <br /> Mr. Himanshu H. Mehta, P.E. <br /> Managing Director <br /> Solid Waste Disposal District <br /> Indian River County <br /> 1325 74th Avenue SW <br /> Vero Beach,Florida 32968 <br /> Subject: Proposal to Provide One Year of Groundwater Monitoring/Reporting and <br /> Related Consulting Services <br /> Former South Gifford Road Landfill <br /> Vero Beach,Indian River County,Florida <br /> Dear Mr. Mehta: <br /> Geosyntec Consultants (Geosyntec) is pleased to submit this letter proposal to the Indian River <br /> County(IRC) Solid Waste Disposal District (SWDD) to provide professional services for Florida <br /> Department of Environmental Protection (FDEP)-required activities associated with continued <br /> implementation of the groundwater monitoring for the chlorinated volatile organic compound <br /> (CVOC) plume at the Former South Gifford Road Landfill located in Vero Beach, Indian River <br /> County, Florida (Site). This fee proposal is based on correspondence with the FDEP and <br /> discussions with IRC. As requested by IRC, this fee proposal includes budget to complete two <br /> semi-annual monitoring and reporting events for the plume monitoring well network, as well as <br /> related consulting services to prepare an annual pollution liabilities evaluation report for identified <br /> IRC-owned environmental liabilities and represent IRC during interactions with regulatory <br /> agencies. Geosyntec has prepared this proposal (professional services as Exhibit 1)as Work Order <br /> No. CCNA-2014 WO No. 5 for the Continuing Contract Agreement for Professional Services <br /> between IRC SWDD and Geosyntec. The remainder of this letter provides an overview of the <br /> project background, a description of the proposed scope of work, a budget estimate, and a <br /> discussion of the schedule for accomplishment of the work described herein. <br /> PROJECT BACKGROUND <br /> As part of the long-term monitoring activities for the identified CVOC plume associated with the <br /> South Gifford Road Landfill, a network of monitoring wells will require sampling on an annual or <br /> semi-annual basis to: (i) confirm that the CVOC plume is not migrating by monitoring the lateral <br /> and vertical extent; (ii)evaluate the impact of source and dissolved plume bioremediation to assess <br /> CVOC plume centerline concentrations over time; and (iii) assess the impact of biological and <br /> physical natural attenuation processes on CVOC plume degradation. <br /> XR 17051\PR 17015 <br /> engineers 1 scientists 1 innovators <br />
The URL can be used to link to this page
Your browser does not support the video tag.