Laserfiche WebLink
2. Gutter Brackets: Prime and paint to match gutter, or clad in gutter material. If <br />painting, form brackets prior to painting and paint prior to installation. Touch up <br />paint after installation. <br />a. 1/4" x 1-1/2" <br />3. Gutter Spacers: 1/ 16" x 1 " <br />4. Drain Pipe Wall Brackets: 1/16" x 1-1/2" <br />a. Prime and paint to match existing wall color. <br />5. Downspout Hangers: Prime and paint to match downspout, or clad in downspout <br />material. If painting, form hangers prior to painting and paint prior to <br />installation. Touch up paint after installation. <br />2.03 PVC DRAIN PIPE <br />A. Schedule 40 PVC pipe, 6 -inch diameter. Prime and paint to match existing wall color. <br />2.04 ROOF -TO -WALL TRANSITION - EXPANSION JOINT (Alternate) <br />A. Situra RedLINE Waterproof Expansion Joint for epoxy resin installation. <br />B. 2 -Component PMMA fluid applied flashing. Acceptable manufacturers include: <br />1. Siplast Parapro <br />2. JM SeamFree <br />3. Engineer Accepted Equivalent <br />2.05 STUCCO STOP/COUNTERFLASHING REPLACEMENT <br />A. Stucco: Factory proportioned, fiber reinforced portland cement & lime based exterior <br />plaster (Stucco), mechanically mixed in the field with graded sand and water. Stucco, <br />metal counterflashing, and stucco application shall meet requirements of ASTM C926 – <br />11 a. <br />B. Field Mixed Materials: <br />Water – Clean and potable <br />Clean, well graded sand, free of deleterious materials in compliance with ASTM <br />C897 or ASTM C144. <br />Material ratios shall be in accordance with stucco manufacturer's written <br />instructions. All stucco materials shall be mechanically mixed to ensure <br />uniformity, and minimize air entrapment. General instructions are as follows: <br />a. Stucco - mix 200 lbs. (90 kg) of sand to an 80 lb (36 kg) bag of Stucco <br />and approximately 4 gallons (15 L) of clean water in a paddle type <br />mortar mixer. Add '/z to 2/3 of the required water, 'h of the sand, and one <br />bag of Stucco in a paddle type mortar mixer. Then add the rest of the <br />sand and sufficient water to achieve a uniform mix of workable <br />consistency. Mix for 3-5 minutes after all materials are in the mixer. <br />Stucco material can be retempered once in the first hour after mixing. <br />Avoid retempering after the first hour and discard material older than 1.5 <br />hours. Keep mix ratio consistent from batch to batch and mix each batch <br />IRC Admin Complex <br />Roof Replacements 07 62 00-3 (Revision No. 1) Sheet Metal Flashing and Trim <br />