My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-059C
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-059C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2017 10:37:09 AM
Creation date
6/8/2017 10:31:16 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/02/2017
Control Number
2017-059C
Agenda Item Number
8.J.
Entity Name
Advanced Roofing Inc.
Subject
Roof Replacement Project for Administration Building
Project Number
1705
Bid Number
2017040
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
337
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.03 <br />2. Prior to installation of exansion joint cover, install compressible insulation in <br />PVC flashing envelope. <br />3. Install sheet metal underlayment adhered to vertical substrate and extending a <br />minimum of 2" down below the top of the expansion joint curb. <br />4. Provide continuous cleat fastened to the expansion joint curb 8" on center. <br />5. Lock expansion joint cover onto cleat and fasten to wall substrate 12" on center. <br />6. Apply sealant tape between receiver flashing and wall substrate and surface <br />mount receiver flashing 12" on center. <br />7. Notch and lap ends of adjoining expansion joint cleat and counterflashing sheet <br />metal sections not less than 4"; apply sealant tape between sections. <br />8. Notch and lap ends of adjoining expansion joint cover sheet metal sections not <br />less than 6" and apply two beads of sealant between sections. Center 8" wide <br />cover plate over exposed edge of sheet metal and apply sealant to each side of <br />lap. Rivet cover plate at 2" on center to one side of lap only. <br />K. Expansion Joint (Altnerate) <br />1. Situra RedLINE expansion joint shall be installed a minimum of 18 -inches on <br />roof surface, and transition into the roof -to -wall expansion joint to provide <br />drainage for water in the roof valley. RedLINE will extend the length of the roof - <br />to -wall expansion joint. <br />2. Clean and prep metal to remove any dust, debris, grease, and contaminants. <br />3. RedLINE fleece must be dry prior to installation. <br />4. Combine and thoroughly mix 2 -component PMMA epoxy resin. <br />5. Lightly bend roof panel trim piece to provide positive slope away from the wall. <br />6. Apply an approximate 1/8 -inch thick uniform layer of PMMA fluid -applied <br />flashing to metal substrates. Press the RedLINE fleece firmly into the PMMA <br />layer using a spatula tool. Do NOT coat the underside of the RedLINE. The <br />PMMA fluid -applied flashing material must wholly encapsulate a minimum of 1- <br />3/4 -inch of the RedLINE fleece edging and extend a minimum of 3/4 -inch onto the <br />substrate. No RedLINE fleece must be left exposed. Apply an approximate 1/8 - <br />inch uniform coat of PMMA flashing material on the top side surface of the <br />RedLINE, making sure to cover the visible RedLINE fleece. PMMA fluid - <br />applied flashing material is to be applied while previous layers are still wet. <br />CLEANING AND PROTECTION <br />A. All sheet metal work shall be thoroughly cleaned of all asphalt, flux, scrapes and dust. <br />B. Scratches through the metal finish shall be replaced to the Owner's satisfaction. <br />END OF SECTION 07 62 00 <br />IRC Admin Complex <br />Roof Replacements 07 62 00-9 (Revision No. 1) Sheet Metal Flashing and Trim <br />
The URL can be used to link to this page
Your browser does not support the video tag.