My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-059C
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-059C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2017 10:37:09 AM
Creation date
6/8/2017 10:31:16 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/02/2017
Control Number
2017-059C
Agenda Item Number
8.J.
Entity Name
Advanced Roofing Inc.
Subject
Roof Replacement Project for Administration Building
Project Number
1705
Bid Number
2017040
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
337
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
frequency of moist -curing can be diminished. <br />Finish Installation: <br />a. Apply finish to primed stucco. Apply finish by spraying or troweling <br />with a stainless steel trowel, depending on the finish specified. Follow <br />these general rules for application of finish: <br />i. Avoid application in direct sunlight. <br />ii. Apply finish in a continuous application, and work a wet edge <br />towards the unfinished wall area. Work to an architectural break <br />in the wall before stopping to avoid cold joints. <br />iii.. Weather conditions affect application and drying time. Hot or <br />dry conditions limit working time and accelerate drying. <br />Adjustments in the scheduling of work may be required to <br />achieve desired results; cool or damp conditions extend working <br />time and retard drying and may require added measures of <br />protection against wind, dust, dirt, rain and freezing. Adjust <br />work schedule and provide protection. <br />iv. Float "R" (rilled texture) finishes with a plastic float to achieve <br />their rilled texture. <br />V. Do not install separate batches of finish side-by-side. <br />vi. Do not apply finish into or over joints or accessories. Apply <br />finish to outside face of wall only. <br />4. Do not apply finish over irregular or unprepared surfaces, or surfaces not in <br />compliance with the requirements of the project specifications. <br />H. Horizontal Drain Pipe and Wall Brackets <br />1. Install horizontal drain pipe and support brackets above roof -to -wall flashing at <br />locations indicated on Contract Drawings. Installed slope of horizontal drain pipe <br />to exceed '/2 -inch per 12 -inches and match surrounding roof slope where <br />possible. <br />2. Apply sealant over the bracket and fastener at each penetration. Sealant color to <br />match existing wall color. Prime and paint wall brackets and pipe to match <br />existing wall color. <br />3. Tie downspout discharges from higher elevation roof areas into the drain pipe. <br />4. Turn drain pipe discharge down into gutter directly above downspout location. <br />I. Drain Pipe Splash Shield <br />1. Fabricate bottom of splash shield to match the contour and slip onto the top of <br />the gutter. Hand crimp splash shield onto gutter. <br />2. Length of splash shield to be approximately 24 -inches, centered with drain pipe <br />location. <br />3. Fasten bottom edge of splash shield, gutter, and gutter spacer with rivets at three <br />equally spaced locations along the splash shield. <br />J. Expansion Joint <br />1. Fabricate expansion joint cover, cleat and receiver as shown in detail drawing in <br />10' lengths. Refer to SMACNA Architectural Sheet Metal Manual Figure 5-6B. <br />IRC Admin Complex <br />Roof Replacements 07 62 00-8 (Revision No. 1) Sheet Metal Flashing and Trim <br />
The URL can be used to link to this page
Your browser does not support the video tag.