My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/02/2017
CBCC
>
Meetings
>
2010's
>
2017
>
05/02/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2025 1:32:50 PM
Creation date
6/12/2017 11:36:24 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
05/02/2017
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
288
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ANDERSEN ANDRE CONSULTING ENGINEERS, INC. <br />Geotechnical Engineering <br />Construction Materials Testing <br />Environmental Consulting <br />Indian River County Engineering Department <br />1801 27th Street, Building `A' <br />Vero Beach, Florida 32960 <br />Attention: Mr. James Ennis, P.E., PMP <br />County Engineer <br />AACE Proposal No. P17-758 <br />(February 9, 2017) <br />(April 19, 2017) <br />Revised.1 April 21, 2017 <br />EXHIBIT A <br />Subject: PROPOSAL FOR CONSTRUCTION MATERIALS TESTING <br />CR 512 WESTBOUND RESURFACING (ROSELAND ROAD TO US1) AND <br />CR 512 EASTBOUND RESURFACING (EASY STREET TO USI) <br />FM No. 431160-1-54-01 <br />IRC PRoJEcT No. 1139 <br />SEBASTIAN, INDIAN RIVER COUNTY, FLORIDA <br />Dear Mr. Ennis: <br />Andersen Andre Consulting Engineers, Inc. (AACE) is pleased to present this proposal for construction <br />materials testing services during the resurfacing of portions of CR512, as indicated above. The purpose of <br />our services, as discussed further herein, will be to provide materials testing in general accordance with the <br />project plans and technical specifications. <br />BACKGROUND INFORMATION <br />We understand that the proposed improvements to CR512 consist of refurbishing (through the Full Depth <br />Reclamation (FDR) process) the dual westbound lanes from Roseland Road to USI (approximately 2.9 miles), <br />and eastbound lanes from Easy Street to US1 (approximately 1 mile). Further, we understand that this is an <br />FDOT Small County Outreach Program (SCOP). Therefore, based on our understanding of the project and <br />on our conversations with the FDOT State Materials Office, the quality control measures listed in the FDOT's <br />Developmental Specification T332 FxllDeptb Reclamation should be adhered to. A project duration of 180 days <br />has been established by Indian River County (150 days to substantial completion). <br />- Balance of page intentionally left blank - <br />834 SW Swan Avenue, Port St. Lucie, Florida 34983 Ph: 772-807-9191 Fx: 772-807-9192 www.aaceinc.com <br />P148 <br />
The URL can be used to link to this page
Your browser does not support the video tag.