Laserfiche WebLink
CR 512 RESURFACING - FM No. 431160-1-54-01 Page -4- <br />IRC PROjECT No. 1139 <br />RACE Proposal No. P17-758 <br />FEE SCHEDULE <br />► ITEM #1: Preuaration of FDOT Earthwork Density Log Book <br />• Project Engineer; 15 hours @ $95.00/hour......................................... $1,425.00 <br />• Senior Project Engineer; 1 hour @ $110.00/hour.................................... 110.00 <br />Item #1 Subtotal: ..................................... $1,535.00 <br />• ITEM #2: Coordination of the Delivery and Testing Roadway Aggregate <br />Samules by PRI Asphalt Technologies (Mix Design Determination) <br />• Project Engineer; 6 hours @ $95.00/hour........................................... $570.00 <br />• Senior Field Technician; 12 hours @ $55.00/hr....................................... $660.00 <br />• PRT Mix Design Testing; 2 tests(') @ $6,800.00/test + 15% ........................... $15,640.00 <br />• UPS Packaging and Ground Shipping(); Lump sum estimate ............................ $750.00 <br />Item #2 Subtotal: .................................... $17,620.00 <br />ITEM #3: Man -Hour Estimate (Field Testing of FDR Roadway Base and Shoulders and <br />OC Services During Paving Operations) <br />We understand that the majority of QC services will be performed by Indian River County personnel. Services that <br />RACE will perform are detailed below. As indicated in a project addendum, our man-hour fee estimate is based on <br />daytime work only. <br />• In -Place Density Testing of FDR Mix and Refurbished Shoulders; <br />- 100 tests @ $23.00/test (minimum 4 tests per hour, per trip) .......................... $2,300.00 <br />• Non -Structural Concrete Testing - Senior Field Technician; 20 hours @ $55.00/hr......... $1,100.00 <br />• Senior Field Technician (for Roadway Coring - 2 techs required for all coring); <br />- 120 hours @ $55.00/hour ......................................................$6,600.00 <br />• Snr. Project Engineer: <br />- Limited Meeting Attendance - 3 meetings x 2 hrs./mg. x $110.00/hour ................. $660.00 <br />- Project Coordination, review of testing results; 28 weeks x 1.5 hrs./week x $110.00/hour .$4,620.00 <br />• Technical Secretary; 28 weeks x 1.5 hrs./week x $48.00/hour .......................... $2,016.00 <br />Item #3 Subtotal: .................................... $17,296.00 <br />ITEM #4: Structural Number of FDR Base Determinationo): <br />• Roadway coring, <br />- Twelve (12) coring mobilizations @ $100.00/day................................ $1,200.00 <br />- Generator/core machine rental; 12 days @ $150.00/day ................... I ...... $1,800.00 <br />- Senior Field Technician (for Roadway Coring - 2 techs required for all wring); <br />100 hours @ $55.00/hour ...................................................$5,500.00 <br />• Project Engineer; 6 hours @ $95.00/hour........................................... $570.00 <br />• PRI Structural Number Verification Testing; 12 tests @ $1,645.00/test + 15% ........... $22,701.00 <br />• Technical Secretary; 20 hours @ $48.00/hour........................................ $960.00 <br />• UPS Ground Shipping; Lump sum estimate ......................................... $500.00 <br />Item #4 Subtotal: .................................... $33,231.00 <br />ITEM #5: Laboratory Testine Estimate('): <br />• Road Base Particle Size Analysis of Pulverized Base: 30 tests @ $95.00/test .............. $2,850.00 <br />• Marshall Stability of FDR Mixture: 55 tests @ $130.00/test ............................ $7,150.00 <br />• Moisture/Density Relationship Testing. 55 tests @ $85.00/test ......................... $4,675.00 <br />• LBR Testing; 25 tests @ $295.00/test ............................................. $7,375.00 <br />• Extraction/Gradation and Asphalt Content Testings); 20 samples @ $190.00/sample ...... $3,800.00 <br />• Roadway coring; <br />- 10 coring mobilizations @ $100.00/day........................................ $1,000.00 <br />- Generator/core machine rental; 10 days @ $150.00/day .......................... $1,500.00 <br />- Specific Gravity Testing of cored samples; 20 cores @ $35.00/core 700.00 <br />Item #5 Subtotal: .................................... $29,050.00 <br />PROTECT TOTAL: $98,73200 <br />P151 <br />