Laserfiche WebLink
CR 512 RESURFACING - FM No. 431160-1-54-01 page -5- <br />IRC PRoJEcr No. 1139 <br />RACE Proposal No. P17-758 <br />NOTES: cI) Two aggregate samples are needed for mix design testing due to thicker asphalt being <br />reported along a portion of the alignment. <br />(2) UPS Ground shipping based on estimated weight of samples of 60 lbs. <br />(3) We have assumed that coring of the FDR base course for Structural Number <br />verification will performed on 12 separate occasions. <br />(4) Laboratory testing quantities are based on the requirements listed in Section 330 of <br />the Standard Specifications for Road and Bridge Construction, on the <br />Developmental Specification T332 Full Depth Reclamation and on the estimated <br />quantities listed on the Itemized Bid Schedule. <br />(5) No asphalt plant testing/inspections are included within this proposal; we anticipate <br />that the selected contractor will perform QC services at the plant. Only specific <br />gravity testing of asphalt cores (obtained during paving operations) and gradation <br />testing are included herein <br />TERMS AND CONDITIONS <br />(1) Unit rates apply to standard working days, Monday through Friday, 7:00 a.m to 6:00 p.m. Testing and <br />hourly rates will be increased by 50% for weekend, holiday or after-hours services (i.e., services performed <br />before 7:00 am or after 7:00 pm). Our man-hour rates as presented herein are based on day -time testing <br />only. No allowances for nighttime work are reflected in our fee. <br />(2) If our testing estimate for a specific work element is insufficient for that particular activity, resources from <br />another work element can be used without prior authorization from the client as long as our total cost <br />estimate is not exceeded. We will notify you in advance if it appears that the cost estimate presented in <br />the attached unit fee schedule will be exceeded. <br />(3) AACE has not been provided with the selected Contractor's proposed schedule (i.e.; paving days, FDR <br />days, etc.). Therefore, man-hours and associated testing quantities are based on our experience with <br />similar projects. Itis possible that our testing budget may require revision based on contractor efficiency, <br />methodology and scheduling. <br />(4) Soil sample and concrete cylinder pickup for laboratory testing (e.g., Proctor, LBR testing, compressive <br />strength, etc.) will be billed at $55.00/hour if not scheduled with other work. <br />(5) Our services do not include reviewing, monitoring or reporting any aspect of the required Maintenance <br />of Traffic (M.O.T.) that may be required for this project. <br />P152 <br />