My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/09/2017 (3)
CBCC
>
Meetings
>
2010's
>
2017
>
05/09/2017 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2025 1:34:44 PM
Creation date
6/15/2017 9:49:41 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
05/09/2017
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT 1 <br />WORK AUTHORIZATION DIRECTIVE <br />No. 2017-005 <br />171i Street Existing Watermain Relocation Project <br />BLUE GOOSE CONSTRUCTION <br />DATE OF ISSUANCE: March, 2017 EFFECTIVE DATE: May 9, 2017 <br />OWNER: Indian River County. <br />CONTRACTOR: Blue Goose Construction <br />CONTRACT: WATER, SEWER AND RECLAIM WATER LINE REPLACEMENT / EXTENSIONS <br />AND MISCELLANEOUS LABOR CONTRACT, BID NO. 2015001, AWARDED September 9, 2014 <br />PROJECT: St.Davd's Lane at Grand Harbor Water Services Replacement Project <br />COUNTY UTILITY PROJECT NO.: UCP N/A CONTRACTOR'S PROJECT NO.: N/A <br />COUNTY WIP. No. <br />You are directed to proceed promptly with the following work: <br />Description: Florida Department of Transportation (FDOT) is planning to widen a portion of 17" Street <br />from US Highway 1 to the 17th Street Causeway Bridge. The subject widening is to begin in the summer <br />of 2017. As part of the widening, FDOT is also relocating drainage structures and pipes. The county's <br />existing water main will be in conflict with the proposed roadway improvements and will need to be <br />relocated. <br />Attachments: Attachment 2 <br />M[th? d of determining Contract Price: <br />Unit Prices: Bid Items as established pursuant to Bid No2015001, and awarded by the Board of <br />County Commissioners on September 9, 2014 to Blue Goose Construction, Inc. <br />❑ Lump Sum <br />❑ Cost of the Work <br />The Cost of Labor, Contingency and Contract Time is summarized below: <br />Labor Cost (rounded) _ <br />$109,457.92 <br />Estimated <br />45 days from NTP <br />Contract Time: <br />ACCEPT <br />By. <br />4�� <br />Blue Goose Construction <br />Labor Contractor <br />Date: In -le <br />RE( <br />By: <br />anager <br />Date: <br />APPROVED: <br />By: <br />COUNTY, CHAIRMAN <br />Joseph E. Flescher <br />Date: <br />F.Wtilitie!AUTQ.dTY - EMPLOYEE FOLDERMAduna Wei g`oda\FDOT17th Street\Labor Conttact\Work Authorization No. 2017-005.doc <br />P91 <br />
The URL can be used to link to this page
Your browser does not support the video tag.