My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/12/2016 (4)
CBCC
>
Meetings
>
2010's
>
2016
>
07/12/2016 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2020 10:12:36 AM
Creation date
6/28/2017 10:58:04 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
07/12/2016
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
429
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />W. O. NO. 1 <br />BRICK MANHOLE REHABILITATION PROJECT <br />PURPOSE <br />The purpose of this Task Order is to describe the Scope of Services for the Brick Manhole <br />Rehabilitation Project. <br />The overall goal of the project is successfully rehabilitate brick manholes using a structural <br />epoxy coating system as an alternative to installation of a FRP liner system. An FRP liner <br />system requires that the cone section be removed and replaced causing significant public <br />disruption and added expense to the OWNER. The OWNER has selected six (6) of their worst <br />brick manholes for this project located within the ixora Park Subdivision. This task order <br />includes the development of performance specifications, application services/inspection/quality <br />control testing of the rehabilitated manholes, and a brief summary technical memorandum. <br />ENGINEER'S SERVICES <br />ENGINEER's services include the following three tasks to complete this assignment. These <br />tasks are discussed in detail below. <br />Task 1 - Performance Specification Development <br />Task 2 - Application Services/Inspection/duality Control Testing <br />Task 3 - Technical Memorandum <br />TASK 1. PERFORMANCE SPECIFICATION DEVELOPMENT <br />ENGINEER will develop a performance specification to cover the brick manhole rehabilitation <br />utilizing a structural epoxy coating system. <br />Deliverables by ENGINEER for OWNER review and input: <br />Performance specification <br />TASK 2. APPLICATION SERVICES/INSPECTION/QUALITY CONTROL <br />Subtask 2.1. Application Services <br />ENGINEER has selected the application of the structural epoxy coating system based on prior <br />successful experience rehabilitating brick manholes. ENGINEER will coordinate the application <br />services to perform the rehabilitation of the six (6) brick 48 -inch diameter manholes. The <br />manhole locations and depth are listed below: <br />2534 2nd Street <br />10'-5" <br />Lift Station 100 <br />12' <br />2464 1 st Place <br />91 <br />2184 1st Place <br />71 <br />HAClienAIndian River County\ContracAIRC 2016-TO2—.doc <br />31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.