My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/12/2016 (4)
CBCC
>
Meetings
>
2010's
>
2016
>
07/12/2016 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2020 10:12:36 AM
Creation date
6/28/2017 10:58:04 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
07/12/2016
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
429
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2413 2nd Street SW 8' <br />2413 2nd Pl. SW 6' <br />Owner will be responsible for any permits and debris removal that may be required, No permits <br />are anticipated, since all work will be performed through the open manhole lid. <br />Subtask 2.2. Inspection <br />ENGINEER will perform limited on-site field inspection and train County inspectors on the steps <br />involved with the successful rehabilitation of brick manholes. Assume three days. <br />Subtask 2.3. Quality Control <br />ENGINEER will observe two quality control tests during subtask 2.2. The first is a spark testing <br />of the finished surface of each manhole to ensure that no pinholes exist. The second is <br />adhesion tests of two of the six manholes to ensure that the minimum adhesion test requirement <br />has been achieved. The test will be extended to failure to access the maximum adhesion that <br />was achieved. Costs associated with this task are included in subtask 2.2. <br />TASK 3. TECHNICAL MEMORANDUM <br />Subtask 3.1. Draft Technical Memorandum <br />At the completion of the manhole rehabilitation (Tasks 1 and 2), ENGINEER will produce a brief <br />draft technical memorandum (TM) summarizing the results of the project and distribute the TIVI <br />to OWNER for review and approval. <br />Subtask 3.3. Final Technical Memorandum <br />The ENGINEER will revise the draft TM as appropriate based on the OWNER's comments <br />received, and submit a Final TM. <br />Task 3 Deliverables: <br />Draft brief TM (PDF) <br />Final TM (PDF) <br />TIME OF PERFORMANCE <br />Completion of the services outlined above will be provided over the course of three months after <br />notice to proceed. <br />PAYMENT <br />OWNER shall pay ENGINEER for ENGINEER's Services, as delineated above, rendered under <br />a lump sum fee of $47,200 (Task 1- $3,125, Task 2.1- $32,175, Task 2.2- $9,260, Task 3- <br />$2,640). <br />HAClienAindian River CountyContracAIRC 2016-TO2—.doc 2 <br />32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.