My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/16/2017 (3)
CBCC
>
Meetings
>
2010's
>
2017
>
05/16/2017 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2025 1:38:58 PM
Creation date
7/17/2017 11:10:19 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
05/16/2017
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
250
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
interaction with regulatory agencies. Task 3 includes preparation of the annual environmental liability <br />evaluation in response to Governmental Accounting Standards Board Statement No. 49 (GASB No. 49), <br />Accounting and Financial Reporting for Pollution Remediation Obligations, which requires the inclusion and <br />calculation of pollution remediation obligations. Task 4 includes field preparation, groundwater sampling, and <br />water level measurements (for a total of 88 wells). Task 5 includes data evaluation and semi-annual reporting. <br />Overall, the current work order is less than the previous level of effort provided by Geosyntec. With <br />implementation of changes to the sampling and reporting program recommended by Geosyntec and <br />approved by FDEP (including a decrease in sampling frequency from semi-annual to annual for 20 wells <br />approved by FDEP in March 2017), the cost of the sampling portion of the current work order is 15% less <br />than the previous cost provided by Geosyntec even with additional effort included for FDEP-required <br />performance and underground injection control (UIC) monitoring following the recent injection activities. <br />FUNDING: <br />Funding for this work is budgeted and available in account number 31521734-033490-03004, which is the <br />one cent sales tax fund used for infrastructure needs of the County. Costs associated with the landfills are <br />authorized uses of the one cent sales tax in addition to infrastructure. <br />Description Account Number Amount <br />One Cent Sales Tax Fund — Infrastructure Needs 1 31521734-033490-03004 $71,456 <br />RECOMMENDATION: <br />Staff recommends that the SWDD Board approves and authorizes the Chairman to sign the attached CCNA- <br />2014 WO No. 5 authorizing Geosyntec to provide groundwater monitoring/reporting and related consulting <br />services for the Former Gifford Road Landfill in compliance with FDEP requirements for a period of one year <br />not to exceed fee of $71,456. <br />ATTACHMENT: <br />1. Geosyntec CCNA-2014 WO No. 5 <br />@BCL@70053567 <br />Page — 2 — <br />P220 <br />
The URL can be used to link to this page
Your browser does not support the video tag.