My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/16/2017 (3)
CBCC
>
Meetings
>
2010's
>
2017
>
05/16/2017 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2025 1:38:58 PM
Creation date
7/17/2017 11:10:19 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
05/16/2017
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
250
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BIC SYSTEMS, INC, <br />/ i�I��itl • ' • <br />P'���+1 <br />TO: Indian River County South <br />2600 6th Ave. S.W. <br />Vero Beach <br />Florida 12444 <br />USA <br />ATN: Tony Etter <br />CC: EnviroSales of Florida, Inc. / ph#: 8631314-06161 fx#: NIA <br />Sam Gutridge <br />Proposal#: 140380 <br />PROJECT: INDIAN RIVER COUNTY, FL (WEST) <br />PROPOSAL DATE: May 10, 2017 <br />The following Notes apply to Aqua -Aerobic Systems' proposal: <br />- We are pleased to quote, for acceptance within 90 days of this date, prices and terms on goods listed below. <br />- Equipment will be furnished by Aqua -Aerobic Systems, Inc. with civil work (if necessary) by the Buyer. <br />- Equipment listed below is for rebuild of one (1) 12.5'x 42' AquaABF unit as requested by the customer. <br />- If additional equipment modifications beyond the proposal scope are required to the filter, they will represent an <br />additional cost. <br />- Turnkey teardown and installation of the equipment will be completed as follows: <br />Removal (Aqua contractor responsibilites) <br />- The Aqua contractor shall remove the sand media, all hold down angles, spacer rods, 1/4-20 hardware, caulk, <br />porous plates, and backwash shoe. <br />- After removal, all cell dividers will be inspected and ledges will be cleaned to be free of caulking by the Aqua <br />contractor. <br />- The backwash and washwater pumps will be removed. <br />Installation (Aqua contractor responsibilities) <br />- Once unit is clean, new alumina oxide porous plates, sealant, retaining angles and hardware will be installed. <br />- New stainless steel spacer rods and hardware will be installed. <br />- The new backwash shoe will then be installed, and the existing wear strip surface smoothed. <br />- A light test will be performed to assure the plates are installed properly for the plant. <br />- The media will be installed via pneumatic truck. <br />- The new backwash and washwater pumps will be installed <br />- After these components have been replaced, a walk through of the entire filter will be performed to check for other <br />possible problems. Wear strips, bearings, pumps, etc. will be inspected to make sure everything is working correctly. <br />The Aqua contractor shall: <br />1. Provide compressed air. <br />2. Offload all equipment shipments. <br />3. Provide a dumpster and disposal for all waste materials. <br />4. Provide plywood for walking on top of the cells, and tarp to cover the filter area during installation. <br />5. Provide fans for air circulation and improved curing of the sealant. <br />6. Dump the existing media at the job site. If the media needs to be disposed of at a landfill then additional costs <br />shall apply. <br />The customer shall provide or confirm the following: <br />1. Electrical service 110V, 20amp needs to be provided by the customer. <br />2. The customer shall prevent influent from entering the filter during the course of the rebuild project. <br />6306 N. Alpine Rd. Loves Park, IL 61111-7655 p 815.654.2501 f 815.654.2508 www.aqua-aerobic.com <br />Copyright 2017, Aqua -Aerobic Systems, Inc <br />Printed: May 10, 2017 Page 1 of 5 <br />P44 <br />
The URL can be used to link to this page
Your browser does not support the video tag.