My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/23/2017 (2)
CBCC
>
Meetings
>
2010's
>
2017
>
05/23/2017 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2025 1:41:22 PM
Creation date
7/17/2017 12:16:19 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
05/23/2017
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
certification of the project. The project involved right-of-way dedication and both FDOT and County permitting <br />of proposed improvements. <br />• State Road 60, Vero Beach, Indian River County, Florida: Mr. Anthony served as project manager for the <br />design and permitting for the addition of a right -turn lane and driveway relocation to serve 2 properties in <br />connection with a retail redevelopment project. The project involved design and permitting of erosion control, <br />horizontal and vertical roadway design, signing and marking, overhead and underground utility relocation, <br />stormwater design and construction observation and certification of the project. The project involved right-of- <br />way dedication and both FDOT and County permitting of proposed improvements. <br />• SR 520 and Townsend Road, Cocoa, Brevard County, Florida: Mr. Anthony served as Project Manager for <br />the design of approximately 2000 LF of new 2 lane roadway along with the addition of a traffic signal and <br />associated intersection widening and modification at each end of the roadway. The project involved erosion <br />control, roadway and signal design, tum lane design, utility relocation and stormwater management design and <br />calculations. The project involved the relocation of Townsend Road but required the existing roadway remain <br />open to traffic while construction of a new retail development was occurring on both sides of the road. The <br />project required public outreach and negotiation with adjacent property owners to modify existing driveway <br />connections. The project scope included design of a new traffic signal, modification of an existing signal and <br />exit ramp at the intersection of 1-95 and SR 520. <br />• State Road 7 / US Route 441 Coconut Creek, Broward County,Florida: Mr. Anthony served as project <br />manager for the design and permitting of roadway improvements to support a new retail development. The <br />scope of work involved 3 new right -turn lanes and driveway connections and extension of existing an existing <br />left -turn lane. In order to provide access from the store to an existing bus route the scope also involved design <br />of a pedestrian footbridge and culverting an existing canal. Design and permitting elements included signing <br />and marking, erosion control, horizontal and vertical design of the tum lanes, utility relocation, stormwater design <br />and construction observation and certification of the project. Due to City requirements the project also involved <br />placing all overhead utilities along the project frontage underground. The project involved right-of-way dedication <br />and both FDOT and County permitting of proposed improvements. <br />Group 10 — CEI — Category 10.1: Roadway CEI <br />Mr. Anthony served as Project Manager and Engineer of Record during construction of parking lots, driveway <br />connections and drive aisles in a variety of commercial development projects. Mr. Anthony participated in pre - <br />construction meetings, ensured that erosion control measures were installed, observed grading, preparation and <br />string lining of sub -grade, base and pavement, reviewed density tests and certified projects to local <br />municipalities. Mr. Anthony observed the construction of the following projects: <br />■ Walmart Pompano Beach, Florida <br />■ Walmart Stuart, Florida <br />■ Walmart Lauderdale Lakes,. Florida <br />■ Walmart Jupiter, Florida <br />• Walmart Coconut Creek, Florida <br />■ Walmart Boynton Beach, Florida <br />■ Walmart Davie, Florida <br />■ Sam's Club Cape Coral, Florida <br />■ Sam's Club Vero Beach, Florida <br />■ Sam's Club Cocoa, Florida <br />Group 13 — Planning — Category 13.6 — Land Planning / Engineering <br />Mr. Anthony has served as Project Manager and Engineer of Record on a variety of land development projects. <br />These projects typically involve the following land planning and engineering functions: <br />20 <br />P70 <br />
The URL can be used to link to this page
Your browser does not support the video tag.