Laserfiche WebLink
• Revise the plans to add a gravity wall and handrail or fencing at the Pinewoods Animal <br />Hospital site. <br />• Revise the plans to add a handrail along the sidewalk at the Cumberland farms site. <br />• Revise the drainage inlets and driveways at the Szechuan Palace site to provide for an <br />additional driveway. <br />• Eliminate the license agreement and driveway layout and grading at the 7-11 site. <br />• Increase the width of the license agreement along the Dodgertown site between station <br />136+50 and 141+50 +/-. <br />• Show all license agreements on the cross sections. <br />Arcadis has provided utility coordination services for the project to show existing utility facilities <br />on the plans and to coordinate with the utility companies for the relocation of their facilities and <br />to address potential utility conflicts. Additional utility coordination will be provided as requested <br />by the County to show existing and proposed underground utilities on the cross sections sheets. <br />The location of the underground facilities will be based on information provided by the utility <br />companies. In addition, the culvert at the IRFWCD canal on the south side of 26th Street will be <br />extended to provide for 40 feet of clearance between the face of curb and the end of the pipe. <br />The following plan sheets will be modified: <br />• Cover Sheet <br />• Quantities and General Notes <br />• Construction Plans <br />• Cross Sections <br />• Signing and Pavement Marking Plans <br />The work included in Amendment No. 8 is in accordance with the existing AGREEMENT dated <br />November 6, 2005 between ARCADIS US, Inc. (ENGINEER) and Indian River County <br />(COUNTY). <br />"SECTION III — SCOPE OF SERVICES" is being modified to incorporate the following: <br />30% and 60%, and 90% plans have been submitted to the County. Engineer will prepare revised <br />90%, and 100% plans. The plan modifications will consist of the following: <br />The Roadway set of plans shall consist of the following: <br />Page 2 of 6 <br />G:\LNR Support\Proposals\WPB\2017\SR 60 & 43rd Avenue\SR60 - 43RD AVE AMENDMENT 8 7-8-17.doc <br />30% <br />60% <br />90% <br />100% <br />Cover Sheet <br />X <br />Typical Sections <br />X <br />Summary of Quantities and General Notes <br />X <br />Page 2 of 6 <br />G:\LNR Support\Proposals\WPB\2017\SR 60 & 43rd Avenue\SR60 - 43RD AVE AMENDMENT 8 7-8-17.doc <br />