Laserfiche WebLink
Details <br />X <br />Plan and Profile Sheets (40 scale) <br />X <br />Cross Sections at 100 ft interval <br />X <br />Signage & Pavement Marking Plans (40 scale) <br />X <br />Intersection Plan & Details <br />X <br />Stormwater Pollution Prevention Plans (SWPPP) <br />X <br />Computation Book <br />X <br />Construction Cost Estimate and Quantities <br />X <br />"SECTION IV - TIME FOR COMPLETION" is being modified to incorporate the following: <br />1. Project shall be completed as follows: <br />a. The time for completion of the 100% design drawings for the plan revisions <br />requested by FDOT shall be one (1) month from the date of execution of this <br />ADDENDUM. Utility coordination work will be as requested by the county <br />and will be completed within six (6) months from the date of execution of this <br />ADDENDUM. <br />2. Deliverables -The ENGINEER shall provide the COUNTY: <br />a. Three (3) 11" x 17" paper signed and sealed of the 100% plans. Also, a pdf <br />format set of the plans on a cd. <br />b. FINAL five (5) 24" x 36" paper signed and sealed "hardcopy", AutoCad <br />drawing file and PDF formats on CD. <br />c. Work Product shall be prepared and supplied in State Plane geometry (NAD83 <br />2007 adjustment if applicable); digital versions are to be prepared and <br />submitted so that the COUNTY or other consultants can readily use it for the <br />design and analysis of the area, as defined. It shall contain all information <br />necessary for third -party surveyor to independently recreate and/or utilize the <br />survey work. It is acknowledged all final products become property of Indian <br />River COUNTY and will be available for use by the public at large. <br />"SECTION V — COMPENSATION" is being modified to incorporate the following: <br />The COUNTY agrees to pay and the ENGINEER or agrees to accept for services <br />rendered pursuant to this Agreement fees in accordance with the following: <br />A. Professional Services Fee <br />1. The basic compensation mutually agreed upon by the ENGINEER and the <br />COUNTY follows: <br />Page 3 of 6 <br />G:\LNR Support\Proposals\WPB\2017\SR 60 & 43rd Avenue\SR60 - 43RD AVE AMENDMENT 8 7-8-17.doc <br />