Laserfiche WebLink
The following is a summary of costs: <br />Charge Associated with <br />This Amendment <br />Roadway Design <br />New Total <br />Compensation <br />Geotechnical Services (Tierra) $0.00 $35,487.50 <br />Engineering $29,500.00 $342,297.03 <br />(ARCADIS) <br />Signal Plans $0.00 $31,488.41 <br />(SIMMONS & WHITE Inc.) <br />Stormwater Pollution Prevention Plans $0.00 $9,022.92 <br />(ARCADIS) <br />Permitting $0.00 $33,090.00 <br />(ARCADIS) <br />Surveying <br />Design Survey $1,313.20 $65,003.60 <br />(ARCADIS) <br />Right of Way Survey and Map $0.00 $20,386.40 <br />(ARCADIS) <br />Structural Design <br />Structural Design for SR 60 over <br />Main Relief Canal bridge $0.00 $76,060.00 <br />(Bridge Design Associates, Inc.) <br />Structural Design for 43`d Avenue over <br />Main Relief Canal bridge $0.00 $67,604.00 <br />(Bridge Design Associates, Inc.) <br />Page 4 of 6 <br />G:\LNR Support\Proposals\WPB\2017\SR 60 & 43rd Avenue\SR60 - 43RD AVE AMENDMENT 8 7-8-17.doc <br />