My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-102
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-102
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2017 10:32:31 AM
Creation date
7/21/2017 10:23:15 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
07/18/2017
Control Number
2017-102
Agenda Item Number
12.G.4. (1 of 2)
Entity Name
Raftelis Financial Consultants
Subject
Water and Wastewater Impact Fee Study
Alternate Name
Impact Fee Study Water and Wastewater
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3) PowerPoint presentations as applicable for scheduled public meetings. <br />4) Draft ordinance provisions and/or comments. <br />5) Final Report. <br />ITEM 2. ADDITIONAL SERVICES <br />Additional Services will be provided as specifically requested by the County for related matters concerning <br />impact fees, such as but not limited to: development of reclaimed water impact fees; preparation and attendance <br />at public workshop meeting; additional meetings including individually with County Commissioners and/or <br />representatives of concerned organizations; meetings with County staff not included in the above Scope of <br />Service Items 1 through 11; modification to the impact fees after the preparation of the draft report; request to <br />fully draft portions of the ordinance; and/or calculation of special circumstances. <br />ITEM 3. ITEMS TO BE FURNISHED AT NO EXPENSE TO THE CONSULTANT <br />The County will assist the Consultant by furnishing, at no cost to the Consultant, all available pertinent <br />information including but not limited to listing of all utility fixed assets by functional system (water and <br />wastewater) with date of original installation, original cost, size, capacity, type of material if applicable, funding, <br />agreements, ordinances, codes, and any other data relative to performance of the above services for the project. <br />It is agreed and understood that the accuracy and veracity of said information and data may be relied upon by <br />the Consultant without independent verification of the same. <br />The County will designate in writing a person to act as the County's representative with respect to the services <br />to be performed for this project. Such person shall have complete authority to transmit instructions, receive <br />information, interpret and define the County's policies and decisions with respect to materials, equipment, <br />elements and systems pertinent to the Consultant's services. <br />SECTION II <br />TIME OF PERFORMANCE <br />Scope of Services for Item I will be completed within one hundred and fifty (150) calendar days from receipt <br />of Notice to Proceed except for delays beyond the reasonable control of the Consultant. Item I Study Tasks 1 <br />through 8 of the Scope of Services are anticipated to be completed within ninety (90) days. Item I Study Tasks <br />9 through 11 and Item II of the Scope of Services will be completed as mutually agreed. The probable time <br />table by tasks for the study is provided below in the graph. <br />Impact Fee Study Probable Time Table <br />Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.