My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-102
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-102
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2017 10:32:31 AM
Creation date
7/21/2017 10:23:15 AM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3) PowerPoint presentations as applicable for scheduled public meetings. <br />4) Draft ordinance provisions and/or comments. <br />5) Final Report. <br />ITEM 2. ADDITIONAL SERVICES <br />Additional Services will be provided as specifically requested by the County for related matters concerning <br />impact fees, such as but not limited to: development of reclaimed water impact fees; preparation and attendance <br />at public workshop meeting; additional meetings including individually with County Commissioners and/or <br />representatives of concerned organizations; meetings with County staff not included in the above Scope of <br />Service Items 1 through 11; modification to the impact fees after the preparation of the draft report; request to <br />fully draft portions of the ordinance; and/or calculation of special circumstances. <br />ITEM 3. ITEMS TO BE FURNISHED AT NO EXPENSE TO THE CONSULTANT <br />The County will assist the Consultant by furnishing, at no cost to the Consultant, all available pertinent <br />information including but not limited to listing of all utility fixed assets by functional system (water and <br />wastewater) with date of original installation, original cost, size, capacity, type of material if applicable, funding, <br />agreements, ordinances, codes, and any other data relative to performance of the above services for the project. <br />It is agreed and understood that the accuracy and veracity of said information and data may be relied upon by <br />the Consultant without independent verification of the same. <br />The County will designate in writing a person to act as the County's representative with respect to the services <br />to be performed for this project. Such person shall have complete authority to transmit instructions, receive <br />information, interpret and define the County's policies and decisions with respect to materials, equipment, <br />elements and systems pertinent to the Consultant's services. <br />SECTION II <br />TIME OF PERFORMANCE <br />Scope of Services for Item I will be completed within one hundred and fifty (150) calendar days from receipt <br />of Notice to Proceed except for delays beyond the reasonable control of the Consultant. Item I Study Tasks 1 <br />through 8 of the Scope of Services are anticipated to be completed within ninety (90) days. Item I Study Tasks <br />9 through 11 and Item II of the Scope of Services will be completed as mutually agreed. The probable time <br />table by tasks for the study is provided below in the graph. <br />Impact Fee Study Probable Time Table <br />Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.