Subtask 1.5 <br />CONSULTANT will also perform an additional geotechnical site investigation for the <br />partial closure portion of this project consisting of hand auger borings on the <br />proposed Segment 2 partial closure area to confirm the thickness and type of the <br />existing intermediate cover material. CONSULTANT will subcontract with Keller, <br />Schleicher and MacWilliam (KSM) Engineering and Testing to perform an estimated <br />total of up to 25 auger borings. CONSULTANT will stake all the expected boring <br />locations in the field before KSM Engineering and Testing arrives at the site. Once <br />the samples have been collected and classified in the field, they will be placed in <br />appropriate sample containers for transport to a geotechnical laboratory. Up to 12 <br />of the collected samples will be tested in the geotechnical laboratory and evaluated <br />by a professional geotechnical engineer licensed in the State of Florida to determine <br />the nature of the intermediate cover (e.g., particle size, plasticity, and organic <br />content). The proposed number of hand augers and laboratory tests are based on <br />the anticipated variability of the composition of the intermediate cover material. <br />This information will be logged on the existing topographic survey and used during <br />final cover and slope stability design. <br />This subtask also includes one SPT boring to 30 -feet below grade at the location of <br />the proposed Segment 3 leachate pump station, SPT sampling will be performed <br />continuously within the top 10 -feet, and then at 5 -feet intervals thereafter. The <br />boring will be field located based on the boring location plan provided by <br />CONSULTANT. Four grain size analyses will be performed and a boring log with <br />laboratory data will be provided. <br />Based on the results of the evaluation, an engineering design memo will be prepared <br />that includes the following: <br />• Summary of previous geotechnical investigations and available data; <br />• Results of the additional testing performed; <br />• Logs of the test holes; <br />• Diagram of the site/boring layout; <br />• Veneer slope stability analyses; <br />• Geocomposite drainage transmissivity analyses; <br />• Global slope stability analyses; and <br />• Settlement analyses. <br />Initial Coordination with the Florida Department of Environmental Protection <br />This subtask includes the initial coordination with FDEP to discuss the procedure to <br />notify them of the intent to finalize design and construct the previously permitted <br />cell expansion and confirm permitting or notification of the final design and <br />construction of the Segment 2 partial closure and landfill gas expansion. <br />CONSULTANT will prepare for and attend a telephone conference with SWDD and <br />FDEP. Results of this initial coordination will be used to define the regulatory <br />support/permitting assistance services that will be needed and performed under a <br />subsequent phase of this project. Included in this subtask are discussions of what <br />will be required for the Environmental Resource Permit and NPDES permit. <br />CONSULTANT will prepare and distribute meeting minutes after the conference call. <br />A-3 <br />jj2046_Exhibits.docx <br />