Laserfiche WebLink
Subtask 1.6 <br />Initial Alternative Cover Evaluation <br />This subtask includes an initial evaluation of an alternative geosynthetic closure <br />cover system for the partial closure of Segment 2, such as a closure turf type <br />product/technology. The evaluation will vet the potential risks of using a closure <br />turf type product/technology, permitting procedures, and impact on the overall <br />schedule if this design alternative was selected by SWDD. The evaluation will <br />include a comparison of the anticipated design, permitting, short and long-term <br />maintenance, and construction costs. CONSULTANT will prepare a Technical <br />Memorandum documenting the evaluation and recommendations. <br />TASK 2 - PROJECT QUALITY MANAGEMENT <br />Activities performed under this task consist of those generally administrative functions required to <br />maintain the project on schedule, within budget, and that the quality of the work products defined <br />within this scope is consistent with CONSULTANT's standards and SWDD's requirements. <br />CONSULTANT will meet with SWDD staff as necessary for project planning and coordination. <br />CONSULTANT's project manager will prepare and submit monthly invoices and attend status <br />reporting meetings throughout the life of the project. It is estimated that meetings will be held on <br />the average of once a month. Preparation of a health and safety plan, project administration, and an <br />internal project quality planning meeting will also be performed under this task. <br />CONSULTANT maintains a quality management system (QMS) on its projects. This task includes <br />performing a technical specialist review on the technical reports and memos prepared by the <br />CONSULTANT under this Work Order. <br />ASSUMPTIONS <br />• No design, permitting assistance, bidding assistance, and/or engineering services <br />during construction are included in this Work Order. Subsequent phases of this project <br />will include these services. <br />• SWDD will provide all available existing data, as-built/record drawings, site surveys, <br />previously performed design calculations, analysis, drawings, permits and applications, <br />and reports. <br />• All previously performed design calculations, analysis, drawings, and reports that were <br />prepared by Geosyntec Consultants or their subconsultants as part of, and/or <br />referenced in, the 20 -Year Renewal Permit Application and Drawings (dated September <br />2015), are complete, sufficient, accurate, and do not require any revisions/corrections. <br />If CONSULTANT determines that the previously prepared design calculations, analysis, <br />drawings, and reports are incomplete or require revisions/corrections, CONSULTANT <br />reserves the right to seek additional compensation. <br />• No sinkhole evaluation is included in this Work Order. It is assumed that this was <br />addressed during the 20 -Year Renewal Permit Application process. <br />• New survey will be obtained of the area where the proposed leachate pump station will <br />be construction. However, the existing survey along the route of the proposed 6 -inch <br />leachate forcemain is assumed to be sufficient. If it is determined that additional survey <br />is needed along this route, it will be added under the next phase/work order. <br />• CONSULTANT reserves the right to seek additional compensation for work performed, <br />as agreed to by SWDD, beyond what is described in this Work Order. <br />A-4 <br />jj2046_Exhib is docx <br />