My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/13/2017
CBCC
>
Meetings
>
2010's
>
2017
>
06/13/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2025 1:50:41 PM
Creation date
7/21/2017 12:40:58 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
06/13/2017
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
340
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
w <br />INDIAN RIVER COUNTY, FLORIDA <br />BOARD MEMORANDUM <br />TO: Jason E. Brown <br />County Administrator <br />THROUGH: Richard B. Szpyrka, P.E. <br />Public Works Director <br />FROM: James D. Gray, Jr. <br />Coastal Engineer <br />SUBJECT: Work Order No. 3 Morgan & Eklund, Inc. <br />2017 Beach Profile Monitoring Surveys (SUMMER) <br />DATE: May 31, 2017 <br />DESCRIPTION AND CONDITIONS <br />On October 4, 2016, the Board approved a contract with Morgan and Eklund, Inc. (M&E) for <br />Professional Land Surveying and Mapping Services for a two-year term. The Board amended the <br />Contract on October 18, 2016. M&E is the selected County Consultant for professional <br />onshore/offshore hydrographic surveying services. <br />The County's Beach Preservation Plan recommends semiannual'beach profile surveys in order to <br />monitor the seasonal, summer and winter, fluctuations of the beach. The proposed Work Order <br />No. 3 provides summer -time countywide hydrographic surveying (beach profile) services for the <br />Sector 3 and Sector 7 Beach Restoration Projects and additional surveying to complete a 2017 <br />countywide (22.4 miles) monitoring program. All onshore and offshore beach profile surveys are <br />conducted along The Florida Department of Environmental Protection (FDEP) Range Monuments <br />at approximately 1,000 foot intervals (alongshore) and extend from the vegetated dune seaward <br />to a location approximately -40 feet offshore (crosshore). For project tracking purposes, Work <br />Order No. 3 is divided into three (3) separate tasks. <br />Task 1: Summer 2017 Sector 3 Beach and Dune Restoration Proiect Post Construction Monitoring <br />Survey (R -20-R-60) <br />By Permit, annual Post Construction hydrographic surveying is required to assess the <br />performance of the Sector 3 Beach and Dune Project area. Task 1 includes all surveying (7.5 <br />miles) required to complete the 2017 physical monitoring of the Sector 3 Beach and Dune Project <br />area. Task 1 totals a lump sum amount of $22,550. <br />Task 2: Summer 2017 Sector 7 Post Construction Monitoring (R -97-R-108) <br />In the spring of 2007, the County completed construction of the Sector 7 Beach Restoration <br />Project. The County has completed all Permit required post construction monitoring for the <br />Sector 7 Project. However, hydrographic surveys of the project area have continued <br />semiannually to determine the long term performance of the project. Task 2 includes all <br />surveying (2 miles) required to continue the annual monitoring of the Sector 7 Beach <br />Nourishment Project. Task 2 totals a lump sum amount of $6,600. <br />C:\Users\GRANIC-1\AppData\Local\Temp\BCL Technologies\easyPDF <br />7\@BCL@9405A3AF\@BCL@9405A3AF. docx <br />P64 <br />
The URL can be used to link to this page
Your browser does not support the video tag.