My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/13/2017
CBCC
>
Meetings
>
2010's
>
2017
>
06/13/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2025 1:50:41 PM
Creation date
7/21/2017 12:40:58 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
06/13/2017
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
340
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 <br />BCC Agenda Item <br />June 13, 2017 <br />Task 3: Summer 2017 Countywide Beach Monitoring (R-61— R-96 and R -109-R-119) <br />For the shoreline outside of the Sector 3 and Sector 7 beach projects, countywide beach profile <br />surveys are necessary to identify areas of chronic beach erosion and determine if infrastructure <br />may be vulnerable to storm damage. The beach profile surveys will then be used to determine <br />appropriate projects to mitigate erosion as identified in the County Beach Preservation Plan, <br />including the upcoming Sector 5 Beach Restoration Project. Task 3 includes the remaining <br />countywide (9 miles) beach profile surveys. Task 3 totals a lump sum amount of $25,850. <br />Please note: <br />The Sebastian Inlet District (District), as part of their Inlet Management Plan, conducts <br />semiannual beach profile surveys along the northern 5.6 miles of the County. The District <br />continues to partner with the County and has agreed to provide their certified 2017 beach profile <br />survey data (winter and summer) to the County, resulting in a complete 22.4 mile countywide <br />(semiannual) beach profile survey and a combined annual savings of approximately $33,000 to <br />the County. <br />The Scope of Work for the services under Work Order No. 3 was submitted to the County on April <br />28, 2017. The aggregate of Tasks 1-3 under Work Order No. 3 totals a lump sum amount of <br />$55,000. <br />FUNDING <br />Local funding of Beach Restoration includes a portion of Local Option Tourist Tax Revenue as well <br />as allocation of the One Cent Sales Tax. Funding for Work Order No. 3 will be provided from <br />three (3) separate accounts. <br />Task 1: Summer 2017 Sector 3 Beach and Dune Restoration Proiect Post Construction Monitoring <br />Survey (R -20-R-60) <br />Funding for Task 1 is budgeted and available for monitoring of the Sector 3 Beach Restoration <br />Project in the Beach Restoration Fund, Sector 3 Beach Post Construction Monitoring Account No. <br />12814472-033490-05054. Task 1 totals a lump sum amount of $22,500. <br />Task 2: Summer 2017 Sector 7 Post Construction Monitoring (R -97-R-108) <br />Funding for Task 2 is budgeted and available for monitoring of the Sector 7 Beach Restoration <br />Project in the Beach Restoration Fund, Sector 7 Beach Preservation Monitoring Account No. <br />12814472-033490-05079. Task 2 totals a lump sum amount of $6,600. <br />Task 3: Summer 2017 Countywide Beach Monitoring (R-61— R-96 and R -109-R-119) <br />Funding for Task 3 is budgeted and available for countywide beach surveys in the Beach <br />Restoration Fund, Other Professional Services Account No. 12814472-033190-01024. Task 3 <br />totals a lump sum amount of $25,850. <br />C:\Users\GRANIC-1\AppData\Local\Temp\BCL Technologies\easyPDF <br />7\@BCL@9405A3AF\@BCL@9405A3AF.docx <br />P65 <br />
The URL can be used to link to this page
Your browser does not support the video tag.