My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-117
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-117
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2017 10:58:39 AM
Creation date
8/18/2017 10:56:43 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
08/15/2017
Control Number
2017-117
Agenda Item Number
8AA.
Entity Name
Kimley Horn & Associates
Subject
Gifford Neighborhood 45th Street Beautification Project Phase II
Area
Indian River Farms Water Control Canal Enclosed
Project Number
Work Order No. 14
Alternate Name
Gifford Neighborhood Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Order No. 14 -45th Street <br />Beautification Phase II Improvements, <br />Indian River County <br />7. If applicable, soil boring information shall be plotted on cross sections with <br />soil classification and high season water table. <br />8. All quantities shall reference FDOT Pay Item Numbers. <br />9. All details shall reference FDOT Index Numbers. <br />10. All specifications shall reference to FDOT Specifications for Road and Bridge <br />Construction. Any deviations are special specifications not included in FDOT <br />Specifications are required in the Technical Specifications. <br />11. Initial (40% completion), interim (80% completion) and Final Plan (100% <br />completion) Submittal shall include the following: <br />i. Three (3) Sets of Signed and Sealed Plans. <br />ii. One (1) Opinion of Probable Construction Cost <br />iii. One (1) CD with drawings in PDF format. <br />The plans will be prepared based upon English units. The design will be conducted in <br />MicroStation and Geopak. Final Design files will be provided to the COUNTY in <br />autoCAD format. <br />C. Drainage Design and Permitting: <br />1. Perform drainage investigations and analysis necessary to prepare a design <br />which will drain the project in accordance with the COUNTY, St. Johns River <br />Florida Water Management District (SFWMD), IRFWCD and U.S. Army Corps of <br />Engineers (ACOE) design criteria. The work will include the engineering analyses <br />for the following: <br />a. Design of Roadway Ditches <br />Design roadway conveyance ditches. This includes determining ditch <br />cross sections, grades, selecting suitable channel lining, designing the <br />side drain pipes, and documentation. <br />b. Design of Outfalls <br />Analyze and document the design of ditch or piped outfalls. <br />c. Drainage Design Documentation Report <br />Compile drainage design documentation into report format. Include <br />documentation for all the drainage design tasks and associated <br />meetings and decisions, except those associated with the Pond Siting <br />Analysis Report and Bridge Hydraulics Report. <br />Page 3 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.