My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-117
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-117
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2017 10:58:39 AM
Creation date
8/18/2017 10:56:43 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
08/15/2017
Control Number
2017-117
Agenda Item Number
8AA.
Entity Name
Kimley Horn & Associates
Subject
Gifford Neighborhood 45th Street Beautification Project Phase II
Area
Indian River Farms Water Control Canal Enclosed
Project Number
Work Order No. 14
Alternate Name
Gifford Neighborhood Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work OrdeNo. 14 — 45th Street <br />Beautification Phase 11 1 mprovements, <br />lndian River County <br />2. The Consultant will submit a permit applications to the |RFVV[C\ St. Johns River <br />Water Management District (SJRWMD) and the U.S. Army of Corps Engineers <br />(ACOE) to support the proposed improvements. <br />3. A Stormwater Pollution Prevention Plan (SW3P) will be developed in conjunction <br />with this project. The site specific SW3P is a requirement of both the EPA <br />National Pollutant Discharge Elimination System (NPDES) General Permit for <br />Stormwater Discharges from Construction Activities, and the FDEP Generic <br />Permit for Stormwater Discharges from Construction Activities. <br />4. All permit fees will be paid directly by the COUNTY and are not included in the <br />lump sum fees. <br />D. Franchise Utilitv Coordination: <br />The Consultant will coordinate with franchise utility operators in the vicinity of the <br />project such that the proposed construction activities can be developed to minimize <br />impacts to existing utilities located within the project limits. The Consultant will <br />physically ocate subsurface existing franchise utilities that cross the IRFWCD right- <br />of-way to ensure that conflicts with the proposed culvert improvements are <br />avoided. <br />E. Landscape Plans: <br />The Consultant will prepare Landscape improvement plans consistent with the <br />Phase U conceptual landscape plan, previously approved by the COUNTY. Final <br />design shall include identifying the species/type, size, location, spacing and quality of <br />all plants. The Landscape Plans will be developed to not require an automated <br />irrigation system. <br />Page 4 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.