Laserfiche WebLink
Indian River County Department of Utilities Services <br />ATTACHMENT 1- LABOR AND MATERIAL COST <br />Project: Oaks at Vero - WATER SERVICE INSTALLATION <br />Date: June 6, 2017 <br />TOTAL PROJECT COST $24,499.20 <br />P103 <br />LABOR COSTS <br />MATERIAL COSTS (IRC Direct <br />Purchase) <br />Bid <br />Bid Item <br />Estimated <br />Unit of <br />Labor Unit <br />Total Labor <br />Material Unit <br />Total Material <br />Item No. <br />Description <br />Quantity <br />Measure <br />Price <br />Price <br />Price <br />Price <br />18g <br />Install Water Service Single Long (Close Corp, and Set & <br />Connect Meter Box Only) <br />11 <br />EA. <br />$425.00 <br />$4,675.00 <br />$228.00 <br />$2,508.00 <br />18) <br />Install Water Service Double Long (Close Corp, Install 1" <br />PE, Set & Conned Meter Boxes Only) <br />12 <br />EA. <br />$425.00 <br />$5,100.00 <br />$487.00 <br />$5,844.00 <br />23 <br />Test Holes / Potholes <br />5 <br />EA. <br />$250.00 <br />$1,250.00 <br />$0.00 <br />80a <br />Install 4" Sidewalk <br />300 <br />SF <br />$2.25 <br />$675.00 <br />$3.50 <br />$1,050.00 <br />91 <br />Mobilization, Demobilization, MOT (based on 10% of <br />Labor): <br />1 <br />LS <br />$1,170.00 <br />$1,170.00 <br />Subtotals: <br />Labor: <br />$12,870.00 <br />Material: <br />$9,402.00 <br />Contingency: <br />10% <br />$1,287.00 <br />10% <br />$940.20 <br />Totals: <br />Labor Cost $14,157.00 <br />Materials $10,342.20 <br />TOTAL PROJECT COST $24,499.20 <br />P103 <br />